8031 S ALTAVAN AVE 90045

Certificate Information: 8031 S ALTAVAN AVE 90045

Application / Permit
26016-90000-02883
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 25 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. 3 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Kitchen remodel for residential buildings (no structural changes).
Permit Issued
Issued on 1/30/2026
Issuing Office
Current Status
Permit Finaled on 4/29/2026

Permit Application Status History

Issued 1/30/2026 INTERNET PERMIT
Permit Finaled 4/28/2026 JESUS PINEDA

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Residential Construction Partners Inc; Lic. No.: 1066854-B 15620 POMONA RINCON RD      CHINO HILLS, CA 91709

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 2/3/2026 Not Ready for Inspection WILLIAM ROSE
HVAC-Rough 2/3/2026 Corrections Issued WILLIAM ROSE
PLUMBING-Rough 2/3/2026 Not Ready for Inspection WILLIAM ROSE
ELECTRICAL-Rough 2/6/2026 No Access for Inspection WILLIAM ROSE
HVAC-Rough 2/6/2026 Corrections Issued WILLIAM ROSE
PLUMBING-Rough 2/6/2026 No Access for Inspection WILLIAM ROSE
ELECTRICAL-Rough 2/11/2026 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 2/11/2026 Approved JESUS PINEDA
HVAC-Rough 2/11/2026 Approved JESUS PINEDA
PLUMBING-Rough 2/11/2026 Approved JESUS PINEDA
Shower Pan 2/11/2026 Not Ready for Inspection JESUS PINEDA
Shower Pan 2/17/2026 Corrections Issued JESUS PINEDA
Interior/Exterior Lathing 2/18/2026 Not Ready for Inspection JESUS PINEDA
Shower Pan 2/18/2026 Approved JESUS PINEDA
Interior/Exterior Lathing 2/20/2026 Approved MICHAEL ALLEN
ELECTRICAL-Final 4/28/2026 Approved JESUS PINEDA
Final 4/28/2026 Permit Finaled JESUS PINEDA
HVAC-Final 4/28/2026 Approved JESUS PINEDA
PLUMBING-Final 4/28/2026 Approved JESUS PINEDA