10969 W ROSE AVE 1-8 90034
Certificate Information: 10969 W ROSE AVE 1-8 90034
- Application / Permit
- 26016-30000-00311
- Plan Check / Job No.
- X26WL00052
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __55____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
- Permit Issued
- Issued on 1/6/2026
- Issuing Office
- Current Status
- Permit Finaled on 3/19/2026
Permit Application Status History
| Issued | 1/6/2026 | APPLICANT |
| Permit Finaled | 3/19/2026 | FARHAD DADBIN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | American Jr Roofing Corp; Lic. No.: 1088759-C39 | 4905 DURFEE AVE PICO RIVERA, CA 90660 |
Inspector Information
| FARHAD DADBIN, (310) 914-3922 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/14/2026 | Approved | FARHAD DADBIN |
| Final | 1/23/2026 | Not Ready for Inspection | FARHAD DADBIN |
| SGSOV-Seismic Gas S/O Valve | 1/23/2026 | SGSOV Approved | FARHAD DADBIN |
| Smoke Detectors | 1/23/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 3/16/2026 | No Access for Inspection | CASIMIR BRITTON |
| Smoke Detectors | 3/16/2026 | No Access for Inspection | CASIMIR BRITTON |
| Final | 3/18/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 3/18/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 3/19/2026 | Permit Finaled | FARHAD DADBIN |
| Pre-Inspection | 3/19/2026 | Approved | FARHAD DADBIN |
| Smoke Detectors | 3/19/2026 | Approved | FARHAD DADBIN |