4200 S VIA DOLCE 128 90292

Certificate Information: 4200 S VIA DOLCE 128 90292

Application / Permit
26016-10000-03575
Plan Check / Job No.
B25LA55772
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
ePlan: Interior Remodel of condo unit. Kitchen Remodel-Moving sink 3 ft to the right side & remove wall an add peninsula. One bathroom remodel to include the addition of a double sink & convert the tub into a free-standing tub. Second bathroom remodel to include converting tub into a standing shower and adjust vanity & sink. Remove the Door frame & wall from the hallway to extend to the laundry room (within unit) Non structural wall (non Bearing wall )
Permit Issued
Issued on 3/9/2026
Issuing Office
Current Status
Issued on 3/9/2026

Permit Application Status History

Submitted 2/10/2026 APPLICANT
Assigned to Plan Check Engineer 2/11/2026 TSE MING HUANG
Corrections Issued 2/12/2026 TSE MING HUANG
Applicant returned to address corrections 2/26/2026 TSE MING HUANG
Plan Check Approved 3/9/2026 TSE MING HUANG
Issued 3/9/2026 APPLICANT

Permit Application Clearance Information

Tenant Habitability Plan Cleared 2/24/2026 ARIC DEFUSCO

Contact Information

Contractor Constructor L V Corp; Lic. No.: 1064291-B       ,

Inspector Information

FARHAD DADBIN, (310) 914-3922 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/20/2026 Approved FARHAD DADBIN
Wood Frame 4/20/2026 Not Ready for Inspection FARHAD DADBIN
Pre-Inspection 4/23/2026 Corrections Issued DANIEL ARMENTA
Wood Frame 4/23/2026 Corrections Issued DANIEL ARMENTA
Wood Frame 5/7/2026 Not Ready for Inspection FARHAD DADBIN
Wood Frame 5/11/2026 Partial Approval FARHAD DADBIN
Drywall Nailing 5/19/2026 Approved FARHAD DADBIN