1847 S HI POINT ST 90035

Certificate Information: 1847 S HI POINT ST 90035

Application / Permit
26016-10000-00615
Plan Check / Job No.
X26LA00526
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(3) Bathroom remodel for residential buildings (no structural changes) ELECTRICAL AND MECHANICAL INCLUDED (30) Window and (3) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Replace drywall (no new walls added) for single family dwellings and duplexes only. Re-stucco for residential buildings "COMPLY WITH DEPARTMENT ORDER effective date 07/15/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
Permit Issued
Issued on 1/13/2026
Issuing Office
Current Status
Permit Finaled on 5/11/2026

Permit Application Status History

Issued 1/13/2026 APPLICANT
Permit Finaled 5/8/2026 LUIS CORRAL

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Gallardo Construction Corp; Lic. No.: 1118665-B 817 S HERBERT AVE      LOS ANGELES, CA 90023

Inspector Information

LUIS CORRAL, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
DONALD WONG, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
KIM DOEPPING, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
WILLIAM MICHALAK, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Insulation 1/29/2026 Conditional Approval LUIS CORRAL
Shower Pan 1/29/2026 Conditional Approval LUIS CORRAL
Drywall Nailing 2/5/2026 Approved LUIS CORRAL
Insulation 2/5/2026 Approved LUIS CORRAL
Interior/Exterior Lathing 2/5/2026 Approved LUIS CORRAL
PLUMBING-Rough 2/5/2026 Approved LUIS CORRAL
BUILDING-Rough-Frame 2/18/2026 Corrections Issued LUIS CORRAL
BUILDING-Rough-Frame 3/2/2026 Approved LUIS CORRAL
Interior/Exterior Lathing 3/2/2026 Approved LUIS CORRAL
Final 3/24/2026 Not Ready for Inspection LUIS CORRAL
SGSOV-Seismic Gas S/O Valve 3/24/2026 SGSOV Not Ready LUIS CORRAL
Smoke Detectors 3/24/2026 Approved LUIS CORRAL
Final 5/8/2026 Permit Finaled LUIS CORRAL
SGSOV-Seismic Gas S/O Valve 5/8/2026 SGSOV Approved LUIS CORRAL