3761 N WRIGHTWOOD DR 91604

Certificate Information: 3761 N WRIGHTWOOD DR 91604

Application / Permit
25047-10000-01090
Plan Check / Job No.
B25LA34981
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW POOL PER STANDARD PLAN 268, MAX DEPTH 4.5'
Permit Issued
Issued on 9/15/2025
Issuing Office
Metro
Current Status
Issued on 9/15/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/21/2025 APPLICANT
Assigned to Plan Check Engineer 8/21/2025 JOHN MESIAS
Corrections Issued 9/15/2025 JOSE VELAZQUEZ
Plan Check Approved 9/15/2025 JOSE VELAZQUEZ
Issued 9/15/2025 APPLICANT

Permit Application Clearance Information

Specific Plan Cleared 9/10/2025 RUBEN VASQUEZ
Grading Pre-Inspection Cleared 9/15/2025 JOSE VELAZQUEZ

Contact Information

Architect Cheryl, Fields; Lic. No.: C5386 336 N AZUSA AVE   APT A    AZUSA, CA 91702
Contractor Environmental Landscape Development Inc; Lic. No.: 902300-C53 525 W WOODBURY RD      ALTADENA, CA 91001
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 10/16/2025 Corrections Issued MISAEL ESPARZA
Gas Piping or Gas Test 10/18/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Grounding or Bonding 10/18/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
Pool Piping 10/18/2025 Approved ROBERTO PALACIOS-LOPEZ
Pre-Gunite 10/18/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Grounding or Bonding 10/20/2025 Approved CHRISTOPHE COCHRAN
Grounding or Bonding 10/23/2025 Approved JACK KARGODORIAN
Gas Piping or Gas Test 10/28/2025 Approved CHRISTOPHE COCHRAN
Enclosure/Fence 1/29/2026 Approved JACK KARGODORIAN
SGSOV-Seismic Gas S/O Valve 2/11/2026 SGSOV Not Ready CHRISTOPHE COCHRAN
Pre-Gunite 3/17/2026 Partial Approval CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 3/17/2026 SGSOV Not Ready CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 3/27/2026 Approved CHRISTOPHE COCHRAN
Final 3/27/2026 Corrections Issued CHRISTOPHE COCHRAN
Pre-Gunite 3/27/2026 Not Ready for Inspection CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 3/27/2026 SGSOV Approved CHRISTOPHE COCHRAN
Final 5/20/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Pre-Gunite 5/20/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Final 5/29/2026 Conditional Approval CHRISTOPHE COCHRAN
Pre-Gunite 5/29/2026 Approved CHRISTOPHE COCHRAN