5733 N SIMPSON AVE 1 91607
Certificate Information: 5733 N SIMPSON AVE 1 91607
- Application / Permit
- 25016-90000-36871
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 10 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. 1 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Kitchen remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 12/17/2025
- Issuing Office
- Current Status
- Issued on 12/17/2025
Permit Application Status History
| Issued | 12/17/2025 | INTERNET PERMIT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | La City Builders Inc; Lic. No.: 1124484-B | 6842 VAN NUYS BLVD VAN NUYS, CA 91405 |
Inspector Information
| GAREN HAYRAPETYAN, (818) 374-1171 | Office Hours: 7:00-8:00 AM MON-FRI |
| ROBERTO PALACIOS-LOPEZ, (818) 374-1171 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 1/21/2026 | Approved | JOSE AVILA |
| ELECTRICAL-Rough | 2/21/2026 | Not Ready for Inspection | KEVIN SARGSYAN |
| PLUMBING-Rough | 2/21/2026 | Corrections Issued | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 3/18/2026 | Not Ready for Inspection | GAREN HAYRAPETYAN |
| PLUMBING-Rough | 3/18/2026 | Not Ready for Inspection | GAREN HAYRAPETYAN |
| ELECTRICAL-Rough | 4/8/2026 | Approved | GAREN HAYRAPETYAN |
| PLUMBING-Rough | 4/8/2026 | Approved | GAREN HAYRAPETYAN |
| Drywall Nailing | 4/13/2026 | Approved | GAREN HAYRAPETYAN |
| HVAC-Rough | 4/13/2026 | Approved | GAREN HAYRAPETYAN |