13907 W WYANDOTTE ST 91405

Certificate Information: 13907 W WYANDOTTE ST 91405

Application / Permit
25016-90000-27719
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 10 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. 2 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Kitchen remodel for residential buildings (no structural changes).
Permit Issued
Issued on 9/15/2025
Issuing Office
Current Status
Permit Finaled on 7/22/2026

Permit Application Status History

Issued 9/15/2025 INTERNET PERMIT
Permit Finaled 7/21/2026 OGANES TARAKHCHYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

OGANES TARAKHCHYAN, (818) 374-1162 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 10/22/2025 Corrections Issued DAVID MATSON
Shower Pan 1/29/2026 Corrections Issued OGANES TARAKHCHYAN
Pre-Inspection 2/10/2026 Not Ready for Inspection OGANES TARAKHCHYAN
Shower Pan 2/10/2026 Not Ready for Inspection OGANES TARAKHCHYAN
Shower Pan 2/23/2026 Approved RAUL OLAGI
PLUMBING-Rough 2/25/2026 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 3/2/2026 Approved OGANES TARAKHCHYAN
Rough-Elec/Plmb/HVAC 3/2/2026 Partial Approval OGANES TARAKHCHYAN
Final 7/21/2026 Permit Finaled OGANES TARAKHCHYAN