4955 N WOODMAN AVE 91423
Certificate Information: 4955 N WOODMAN AVE 91423
- Application / Permit
- 25016-90000-23394
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 200 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. New Stucco w/wire lath over (e) siding to remain. Area = 400 sqft. 3 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Kitchen remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 7/30/2025
- Issuing Office
- Current Status
- Permit Finaled on 2/17/2026
Permit Application Status History
| Issued | 7/30/2025 | INTERNET PERMIT |
| Permit Finaled | 2/17/2026 | MISAEL ESPARZA |
Permit Application Clearance Information
| Hold | Not Cleared | 9/3/2025 | Department of Building and Safety |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| MISAEL ESPARZA, (818) 374-1169 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 11/5/2025 | Not Ready for Inspection | MISAEL ESPARZA |
| Interior/Exterior Lathing | 11/5/2025 | Corrections Issued | MISAEL ESPARZA |
| ELECTRICAL-Final | 1/12/2026 | Not Ready for Inspection | MISAEL ESPARZA |
| Final | 1/12/2026 | Not Ready for Inspection | MISAEL ESPARZA |
| HVAC-Final | 1/12/2026 | Not Ready for Inspection | MISAEL ESPARZA |
| PLUMBING-Final | 1/12/2026 | Not Ready for Inspection | MISAEL ESPARZA |
| ELECTRICAL-Final | 1/21/2026 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| Final | 1/21/2026 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| HVAC-Final | 1/21/2026 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| PLUMBING-Final | 1/21/2026 | Approved | ROBERTO PALACIOS-LOPEZ |
| ELECTRICAL-Final | 2/17/2026 | Approved | MISAEL ESPARZA |
| Final | 2/17/2026 | Permit Finaled | MISAEL ESPARZA |
| HVAC-Final | 2/17/2026 | Approved | MISAEL ESPARZA |
| PLUMBING-Final | 2/17/2026 | Approved | MISAEL ESPARZA |