16521 W AKRON ST 90272
Certificate Information: 16521 W AKRON ST 90272
- Application / Permit
- 25016-90000-13098
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 1 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only. Kitchen remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 4/24/2025
- Issuing Office
- Current Status
- Permit Finaled on 9/17/2025
Permit Application Status History
| Issued | 4/24/2025 | INTERNET PERMIT |
| Permit Finaled | 9/17/2025 | BOBBY KEY |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Vision Adu Llc; Lic. No.: 1115842-B | 405 S MISSION DR SAN GABRIEL, CA 91776 |
Inspector Information
| DANIEL VERA, (213) 577-9924 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 5/23/2025 | Not Ready for Inspection | DANIEL VERA |
| ELECTRICAL-Rough | 5/23/2025 | Corrections Issued | DANIEL VERA |
| PLUMBING-Rough | 5/23/2025 | Corrections Issued | DANIEL VERA |
| Rough-Elec/Plmb/HVAC | 5/23/2025 | Not Ready for Inspection | DANIEL VERA |
| Rough-Elec/Plmb/HVAC | 5/28/2025 | Corrections Issued | TEMISTOCLES CAAL |
| ELECTRICAL-Rough | 6/5/2025 | Not Ready for Inspection | BOBBY KEY |
| HVAC-Rough | 6/5/2025 | Not Ready for Inspection | BOBBY KEY |
| PLUMBING-Rough | 6/5/2025 | Corrections Issued | BOBBY KEY |
| BUILDING-Rough-Frame | 6/11/2025 | Approved | TEMISTOCLES CAAL |
| Rough-Elec/Plmb/HVAC | 6/11/2025 | Approved | TEMISTOCLES CAAL |
| Insulation | 6/13/2025 | Approved | TEMISTOCLES CAAL |
| Drywall Nailing | 6/21/2025 | Corrections Issued | CHRISTOPHER WILSON |
| Drywall Nailing | 6/23/2025 | Approved | CHRISTOPHER WILSON |
| Insulation | 6/23/2025 | Approved | CHRISTOPHER WILSON |
| Interior/Exterior Lathing | 7/10/2025 | Approved | STEPHANIE SWANSON |
| Shower Pan | 7/10/2025 | Approved | STEPHANIE SWANSON |
| Floor/Roof Diaphrgm/Shear Wall | 8/4/2025 | Approved | BOBBY KEY |
| Gas Test | 8/6/2025 | No Access for Inspection | KENNETH NAGLE |
| Gas Test | 8/7/2025 | Not Ready for Inspection | BOBBY KEY |
| Gas Test | 8/8/2025 | Approved | BOBBY KEY |
| Final | 9/17/2025 | Permit Finaled | BOBBY KEY |