1130 E PAGODA PL 90031
Certificate Information: 1130 E PAGODA PL 90031
- Application / Permit
- 25016-90000-08664
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 3/24/2025
- Issuing Office
- Current Status
- Permit Finaled on 4/28/2025
Permit Application Status History
| Issued | 3/24/2025 | INTERNET PERMIT |
| Permit Finaled | 4/25/2025 | LILIANA PORTILLO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Universal Home Design Inc; Lic. No.: 826744-B | 5815 WILKINSON AVE N HOLLYWOOD, CA 91607 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 3/26/2025 | Approved | LILIANA PORTILLO |
| ELECTRICAL-Rough | 4/3/2025 | Approved | LILIANA PORTILLO |
| HVAC-Rough | 4/3/2025 | Approved | LILIANA PORTILLO |
| Insulation | 4/3/2025 | Approved | LILIANA PORTILLO |
| Interior/Exterior Lathing | 4/3/2025 | Corrections Issued | LILIANA PORTILLO |
| PLUMBING-Rough | 4/3/2025 | Approved | LILIANA PORTILLO |
| Shower Pan | 4/3/2025 | Approved | LILIANA PORTILLO |
| Drywall Nailing | 4/7/2025 | Not Ready for Inspection | JOSH MEISTER |
| Drywall Nailing | 4/9/2025 | Approved | LILIANA PORTILLO |
| Interior/Exterior Lathing | 4/9/2025 | Approved | LILIANA PORTILLO |
| ELECTRICAL-Final | 4/21/2025 | Not Ready for Inspection | LILIANA PORTILLO |
| Final | 4/21/2025 | Corrections Issued | LILIANA PORTILLO |
| HVAC-Final | 4/21/2025 | Approved | LILIANA PORTILLO |
| PLUMBING-Final | 4/21/2025 | Approved | LILIANA PORTILLO |
| Final | 4/25/2025 | Permit Finaled | LILIANA PORTILLO |