17950 W COHASSET ST 91335
Certificate Information: 17950 W COHASSET ST 91335
- Application / Permit
- 25016-90000-01868
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 3 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 8 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. 2 bathroom(s).Bathroom remodel for residential buildings (no structural changes). Fire damage repair for residential buildings only (maximum 10% of replacement cost of building).
- Permit Issued
- Issued on 1/22/2025
- Issuing Office
- Current Status
- Permit Finaled on 9/10/2025
Permit Application Status History
| Issued | 1/22/2025 | INTERNET PERMIT |
| Permit Finaled | 9/9/2025 | ARUTYUN MADATYAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Ikon Builders Inc; Lic. No.: 966760-B | 32158 CAMINO CAPISTRANO A366 SAN JUAN CAPISTRANO, CA 92675 |
Inspector Information
| ARUTYUN MADATYAN, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JUAN ALVARADO, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| Floor/Roof Diaphrgm/Shear Wall | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| Gas Test | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| HVAC-Rough | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| PLUMBING-Rough | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| Rough-Elec/Plmb/HVAC | 4/22/2025 | Corrections Issued | ARUTYUN MADATYAN |
| Shower Pan | 4/22/2025 | Approved | ARUTYUN MADATYAN |
| Insulation | 5/14/2025 | Approved | ARUTYUN MADATYAN |
| Drywall Nailing | 5/28/2025 | Not Ready for Inspection | ARUTYUN MADATYAN |
| Drywall Nailing | 5/31/2025 | No Access for Inspection | SEAN HAUPT |
| Interior/Exterior Lathing | 5/31/2025 | No Access for Inspection | SEAN HAUPT |
| Drywall Nailing | 6/4/2025 | Approved | ARUTYUN MADATYAN |
| Interior/Exterior Lathing | 6/4/2025 | Partial Approval | ARUTYUN MADATYAN |
| Final | 9/3/2025 | Corrections Issued | ARUTYUN MADATYAN |
| Final | 9/9/2025 | Permit Finaled | ARUTYUN MADATYAN |