900 S 3RD AVE 90019
Certificate Information: 900 S 3RD AVE 90019
- Application / Permit
- 25016-70000-29233
- Plan Check / Job No.
- X25SL01111
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __30__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B DETACHED GARAGE INCLUDED
- Permit Issued
- Issued on 9/30/2025
- Issuing Office
- Current Status
- Permit Finaled on 10/14/2025
Permit Application Status History
| No Progress | 9/30/2025 | SARA LOPEZ |
| Issued | 9/30/2025 | APPLICANT |
| Permit Finaled | 10/14/2025 | THOMAS LOGRASSO |
Permit Application Clearance Information
| HPOZ | Cleared | 9/30/2025 | MICAELA TORRES-GIL |
Contact Information
| Contractor | Google Roofing Inc; Lic. No.: 1123913-C39 | 3333 W 2ND ST 51 - 323 LOS ANGELES, CA 90004 |
Inspector Information
| JEFFREY MEAD, (213) 202-3240 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 10/2/2025 | Approved | THOMAS LOGRASSO |
| Final | 10/14/2025 | Permit Finaled | THOMAS LOGRASSO |
| SGSOV-Seismic Gas S/O Valve | 10/14/2025 | SGSOV Approved | THOMAS LOGRASSO |
| Smoke Detectors | 10/14/2025 | Approved | THOMAS LOGRASSO |