222 S 6TH AVE 90291

Certificate Information: 222 S 6TH AVE 90291

Application / Permit
25016-40000-21800
Plan Check / Job No.
X25SP02167
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-stucco for residential buildings, 5-Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing ___15___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
Permit Issued
Issued on 8/18/2025
Issuing Office
Current Status
Permit Finaled on 3/31/2026

Permit Application Status History

No Progress 7/15/2025 GINA DELGADO
Issued 8/18/2025 APPLICANT
Permit Finaled 3/31/2026 DAVID FEILER

Permit Application Clearance Information

Coastal Zone Cleared 8/8/2025 NOAH MCCOY

Contact Information

Contractor Owner-Builder       ,

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 8/23/2025 No Access for Inspection STUART CHAPMAN
Interior/Exterior Lathing 8/23/2025 No Access for Inspection STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 9/19/2025 Approved WILLIAM ROSE
Interior/Exterior Lathing 9/19/2025 Approved WILLIAM ROSE
Final 11/22/2025 No Access for Inspection BOBBY KEY
SGSOV-Seismic Gas S/O Valve 11/22/2025 SGSOV Not Ready BOBBY KEY
Smoke Detectors 11/22/2025 No Access for Inspection BOBBY KEY
Final 11/26/2025 Corrections Issued THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 11/26/2025 SGSOV Approved THOMAS LOGRASSO
Smoke Detectors 11/26/2025 Approved THOMAS LOGRASSO
Final 3/31/2026 Permit Finaled DAVID FEILER