1607 N AVENUE 54 90042
Certificate Information: 1607 N AVENUE 54 90042
- Application / Permit
- 25016-30000-23309
- Plan Check / Job No.
- X25WL06226
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1) Kitchen and (2) Bathroom remodel for residential buildings (no structural changes) INCLUDING ELECTRICAL AND PLUMBING & Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___24___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
- Permit Issued
- Issued on 7/30/2025
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 3/20/2026
Permit Application Status History
| Issued | 7/30/2025 | APPLICANT |
| Permit Finaled | 3/19/2026 | LILIANA PORTILLO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Rivera'S Construction; Lic. No.: 1060375-B | 8354 BOER AV WHITTIER, CA 90606 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 9/12/2025 | Approved | DAVID WILLIAMS |
| PLUMBING-Rough | 9/12/2025 | Not Ready for Inspection | DAVID WILLIAMS |
| ELECTRICAL-Rough | 9/27/2025 | Approved | DANIEL VERA |
| HVAC-Rough | 9/27/2025 | Corrections Issued | DANIEL VERA |
| PLUMBING-Rough | 9/27/2025 | Corrections Issued | DANIEL VERA |
| HVAC-Rough | 9/30/2025 | Approved | DAVID WILLIAMS |
| PLUMBING-Rough | 9/30/2025 | Approved | DAVID WILLIAMS |
| Drywall Nailing | 10/7/2025 | Approved | DAVID WILLIAMS |
| Interior/Exterior Lathing | 10/7/2025 | Approved | DAVID WILLIAMS |
| PLUMBING-Rough | 10/7/2025 | Approved | DAVID WILLIAMS |
| Interior/Exterior Lathing | 12/2/2025 | Approved | DAVID WILLIAMS |
| Final | 3/19/2026 | Permit Finaled | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 3/19/2026 | SGSOV Approved | LILIANA PORTILLO |
| Smoke Detectors | 3/19/2026 | Approved | LILIANA PORTILLO |