1150 W CAPITOL DR #21 90732
Certificate Information: 1150 W CAPITOL DR #21 90732
- Application / Permit
- 25016-30000-16490
- Plan Check / Job No.
- X25WL04113
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 13_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
- Permit Issued
- Issued on 5/19/2025
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 6/16/2025
Permit Application Status History
| Issued | 5/19/2025 | APPLICANT |
| Permit Finaled | 6/16/2025 | MICHAEL PETRUSKO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Socal Roofing; Lic. No.: 1081207-C39 | 5800 HAMNER AVE 387 MIRA LOMA, CA 91752 |
Inspector Information
| MICHAEL PETRUSKO, (310) 732-4552 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 5/21/2025 | Corrections Issued | JOSEPH MCGARRY |
| Floor/Roof Diaphrgm/Shear Wall | 5/23/2025 | Approved | JOEY BUCHANAN |
| Final | 6/4/2025 | Corrections Issued | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 6/4/2025 | SGSOV Not Ready | MICHAEL PETRUSKO |
| Smoke Detectors | 6/4/2025 | Not Ready for Inspection | MICHAEL PETRUSKO |
| Final | 6/9/2025 | Not Ready for Inspection | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 6/9/2025 | SGSOV Not Ready | MICHAEL PETRUSKO |
| Smoke Detectors | 6/9/2025 | Not Ready for Inspection | MICHAEL PETRUSKO |
| Final | 6/16/2025 | Permit Finaled | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 6/16/2025 | SGSOV Approved | MICHAEL PETRUSKO |
| Smoke Detectors | 6/16/2025 | Approved | MICHAEL PETRUSKO |