1304 N MARIPOSA AVE 90027

Certificate Information: 1304 N MARIPOSA AVE 90027

Application / Permit
25016-30000-11191
Plan Check / Job No.
X25WL02913
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
(1)Kitchen & (1)bathroom remodel for residential buildings (no structural changes). Combine with electrical, hvac, & plumbing. (3)Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
Permit Issued
Issued on 4/10/2025
Issuing Office
Current Status
Issued on 4/10/2025

Permit Application Status History

Issued 4/10/2025 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Graceland Remodeling Inc; Lic. No.: 1061970-B 16200 VENTURA BLVD #314      ENCINO, CA 91436

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 4/18/2025 Approved CRAIG VAUGHAN
HVAC-Rough 4/18/2025 Corrections Issued CRAIG VAUGHAN
PLUMBING-Rough 4/18/2025 Approved CRAIG VAUGHAN
Interior/Exterior Lathing 4/21/2025 Not Ready for Inspection BRIAN SULLIVAN
Shower Pan 4/21/2025 Corrections Issued BRIAN SULLIVAN
Interior/Exterior Lathing 4/23/2025 Approved CRAIG VAUGHAN
Shower Pan 4/23/2025 Partial Approval CRAIG VAUGHAN
Final 5/5/2025 Not Ready for Inspection CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 5/5/2025 SGSOV Not Ready CRAIG VAUGHAN
Smoke Detectors 5/5/2025 Not Ready for Inspection CRAIG VAUGHAN
Final 5/7/2025 Not Ready for Inspection CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 5/7/2025 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 5/7/2025 Approved CRAIG VAUGHAN
ELECTRICAL-Final 5/15/2025 No Access for Inspection CRAIG VAUGHAN
Final 5/15/2025 No Access for Inspection CRAIG VAUGHAN
HVAC-Final 5/15/2025 No Access for Inspection CRAIG VAUGHAN
PLUMBING-Final 5/15/2025 No Access for Inspection CRAIG VAUGHAN
ELECTRICAL-Final 5/17/2025 Not Ready for Inspection MEL KHACHATOURIAN
Final 5/17/2025 Not Ready for Inspection MEL KHACHATOURIAN
HVAC-Final 5/17/2025 Not Ready for Inspection MEL KHACHATOURIAN
PLUMBING-Final 5/17/2025 Not Ready for Inspection MEL KHACHATOURIAN