2450 N COLDWATER CANYON DR 90210
Certificate Information: 2450 N COLDWATER CANYON DR 90210
- Application / Permit
- 25016-30000-06976
- Plan Check / Job No.
- X25WL01950
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- KITCHEN REMODEL COMBINED WITH HVAC FOR RESIDENTIAL BUILDINGS (NO STRUCTURAL CHANGES). Windows (10) and Doors (5) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 3/13/2025
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 10/20/2025
Permit Application Status History
| Issued | 3/13/2025 | APPLICANT |
| Permit Finaled | 10/16/2025 | RAUL BARAJAS |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Elixir Construction; Lic. No.: 1081239-B | 65 CHADRON CIR LADERA RANCH, CA 92694 |
Inspector Information
| BRENDAN MORELLI, (213) 202-3412 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Order to Comply | 3/14/2025 | Not Required | RAUL BARAJAS |
| Interior/Exterior Lathing | 3/25/2025 | Partial Approval | RAUL BARAJAS |
| Interior/Exterior Lathing | 3/28/2025 | Approved | RAUL BARAJAS |
| Final | 10/15/2025 | Not Ready for Inspection | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 10/15/2025 | SGSOV Not Ready | ROY SPAULDING |
| Smoke Detectors | 10/15/2025 | Not Ready for Inspection | ROY SPAULDING |
| Final | 10/16/2025 | Permit Finaled | RAUL BARAJAS |
| SGSOV-Seismic Gas S/O Valve | 10/16/2025 | SGSOV Approved | RAUL BARAJAS |
| Smoke Detectors | 10/16/2025 | Approved | RAUL BARAJAS |