2015 S BEVERLY GLEN BLVD 90025

Certificate Information: 2015 S BEVERLY GLEN BLVD 90025

Application / Permit
25016-30000-03901
Plan Check / Job No.
X25WL01047
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(35) Condo-Multi Family
Work Description
(20 squares )Remove existing roof tiles, apply new underlayment and reset roof tiles (Cool roof compliance is not required) AND Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___10___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
Permit Issued
Issued on 2/12/2025
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 5/5/2025

Permit Application Status History

Issued 2/12/2025 APPLICANT
Permit Finaled 5/5/2025 RICARDO ROBLES

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Munoz Roof And Roof Removal Inc; Lic. No.: 1076970-C39 12033 LOS REYES AVE      LA MIRADA, CA 90631

Inspector Information

ROGELIO REYNA, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 2/21/2025 Partial Approval RICARDO ROBLES
Final 3/4/2025 No Access for Inspection AMANUEL BERHE
SGSOV-Seismic Gas S/O Valve 3/4/2025 SGSOV Not Ready AMANUEL BERHE
Smoke Detectors 3/4/2025 Not Ready for Inspection AMANUEL BERHE
Final 3/14/2025 Partial Inspection AMANUEL BERHE
SGSOV-Seismic Gas S/O Valve 3/14/2025 SGSOV Gas Company AMANUEL BERHE
Smoke Detectors 3/14/2025 Not Ready for Inspection AMANUEL BERHE
Smoke Detectors 4/2/2025 Corrections Issued MICHAEL PETRUSKO
Final 4/7/2025 Not Ready for Inspection VASIL MIHALEV
Smoke Detectors 4/7/2025 Not Ready for Inspection VASIL MIHALEV
Smoke Detectors 4/29/2025 Partial Approval RICARDO ROBLES
Final 5/5/2025 Permit Finaled RICARDO ROBLES
Smoke Detectors 5/5/2025 Approved RICARDO ROBLES