2015 S BEVERLY GLEN BLVD 90025
Certificate Information: 2015 S BEVERLY GLEN BLVD 90025
- Application / Permit
- 25016-30000-03901
- Plan Check / Job No.
- X25WL01047
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (35) Condo-Multi Family
- Work Description
- (20 squares )Remove existing roof tiles, apply new underlayment and reset roof tiles (Cool roof compliance is not required) AND Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___10___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
- Permit Issued
- Issued on 2/12/2025
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 5/5/2025
Permit Application Status History
| Issued | 2/12/2025 | APPLICANT |
| Permit Finaled | 5/5/2025 | RICARDO ROBLES |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Munoz Roof And Roof Removal Inc; Lic. No.: 1076970-C39 | 12033 LOS REYES AVE LA MIRADA, CA 90631 |
Inspector Information
| ROGELIO REYNA, (310) 914-3920 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 2/21/2025 | Partial Approval | RICARDO ROBLES |
| Final | 3/4/2025 | No Access for Inspection | AMANUEL BERHE |
| SGSOV-Seismic Gas S/O Valve | 3/4/2025 | SGSOV Not Ready | AMANUEL BERHE |
| Smoke Detectors | 3/4/2025 | Not Ready for Inspection | AMANUEL BERHE |
| Final | 3/14/2025 | Partial Inspection | AMANUEL BERHE |
| SGSOV-Seismic Gas S/O Valve | 3/14/2025 | SGSOV Gas Company | AMANUEL BERHE |
| Smoke Detectors | 3/14/2025 | Not Ready for Inspection | AMANUEL BERHE |
| Smoke Detectors | 4/2/2025 | Corrections Issued | MICHAEL PETRUSKO |
| Final | 4/7/2025 | Not Ready for Inspection | VASIL MIHALEV |
| Smoke Detectors | 4/7/2025 | Not Ready for Inspection | VASIL MIHALEV |
| Smoke Detectors | 4/29/2025 | Partial Approval | RICARDO ROBLES |
| Final | 5/5/2025 | Permit Finaled | RICARDO ROBLES |
| Smoke Detectors | 5/5/2025 | Approved | RICARDO ROBLES |