4860 S ASCOT AVE 90011
Certificate Information: 4860 S ASCOT AVE 90011
- Application / Permit
- 25016-20000-19409
- Plan Check / Job No.
- X25VN17419
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- Kitchen/bathroom (1) remodel for residential buildings (no structural changes). Window (8) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (8) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
- Permit Issued
- Issued on 6/20/2025
- Issuing Office
- Current Status
- Permit Finaled on 12/27/2025
Permit Application Status History
| Issued | 6/20/2025 | APPLICANT |
| Permit Finaled | 12/23/2025 | LUIS CASTRO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Harbor Coast Construction; Lic. No.: 1116298-B | 14708 S MARIPOSA AVE GARDENA, CA 90247 |
Inspector Information
| ALEJANDRO DE ARTOLA, (213) 202-3128 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 7/8/2025 | Approved | SABAS ALONSO |
| Insulation | 7/10/2025 | Approved | RONNIE MEDINA |
| Drywall Nailing | 7/15/2025 | Approved | STUART CHAPMAN |
| Interior/Exterior Lathing | 7/15/2025 | Partial Approval | STUART CHAPMAN |
| Final | 10/22/2025 | Corrections Issued | LUIS CASTRO |
| SGSOV-Seismic Gas S/O Valve | 10/22/2025 | SGSOV Not Ready | LUIS CASTRO |
| Smoke Detectors | 10/22/2025 | Approved | LUIS CASTRO |
| Final | 12/23/2025 | Permit Finaled | LUIS CASTRO |
| SGSOV-Seismic Gas S/O Valve | 12/23/2025 | SGSOV Approved | LUIS CASTRO |