1453 1/2 W 48TH ST 90062

Certificate Information: 1453 1/2 W 48TH ST 90062

Application / Permit
25016-20000-15852
Plan Check / Job No.
B25VN13580
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
FIRE DAMAGE REPAIRS TO THE (E) ROOF SHEATHING. NEW DRYWALL.
Permit Issued
Issued on 5/14/2025
Issuing Office
Valley
Current Status
Issued on 5/14/2025

Permit Application Status History

Submitted 5/14/2025 APPLICANT
Assigned to Plan Check Engineer 5/14/2025 ISIS ARGUETA
Plan Check Approved 5/14/2025 ISIS ARGUETA
Issued 5/14/2025 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Property Construction & Maintenance; Lic. No.: 802363-B 6474 CORVETTE ST      COMMERCE, CA 90040
Engineer Medina,, Ferdinand Casaclang; Lic. No.: C88007 1051 S HOLT AVE APT F      LOS ANGELES, CA 90035

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/29/2025 Corrections Issued ANTHONY RAMOS
ELECTRICAL-Rough 7/11/2025 Not Ready for Inspection BARRY HACHE
PLUMBING-Rough 7/11/2025 Not Ready for Inspection BARRY HACHE
ELECTRICAL-Rough 7/23/2025 Corrections Issued BARRY HACHE
ELECTRICAL-Rough 8/8/2025 Corrections Issued BARRY HACHE
HVAC-Rough 8/8/2025 Approved BARRY HACHE
PLUMBING-Rough 8/8/2025 Corrections Issued BARRY HACHE
ELECTRICAL-Rough 8/27/2025 Not Ready for Inspection BARRY HACHE
BUILDING-Rough-Frame 8/29/2025 Approved BARRY HACHE
ELECTRICAL-Rough 8/29/2025 Approved BARRY HACHE
PLUMBING-Rough 8/29/2025 Approved BARRY HACHE
ELECTRICAL-Final 9/4/2025 Corrections Issued BARRY HACHE
Insulation 9/4/2025 Approved BARRY HACHE
Drywall Nailing 9/17/2025 Approved BARRY HACHE
Interior/Exterior Lathing 10/6/2025 Approved SABAS ALONSO
ELECTRICAL-Final 11/20/2025 Corrections Issued BARRY HACHE
Final 11/20/2025 Not Ready for Inspection BARRY HACHE
HVAC-Final 11/20/2025 Approved BARRY HACHE
PLUMBING-Final 11/20/2025 Corrections Issued BARRY HACHE
SGSOV-Seismic Gas S/O Valve 11/20/2025 SGSOV Approved BARRY HACHE
Smoke Detectors 11/20/2025 Corrections Issued BARRY HACHE
Final 11/24/2025 Not Ready for Inspection ANTHONY RAMOS
Smoke Detectors 11/24/2025 Approved ANTHONY RAMOS