3223 N SHEFFIELD AVE 90032

Certificate Information: 3223 N SHEFFIELD AVE 90032

Application / Permit
25016-20000-14810
Plan Check / Job No.
X25VN12806
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Comply with Department Order effective date 09/20/2022. If additional assistance is needed please call Senior Inspector SHAWN ESHBACH at (213)252-3962. CEIS Case Number is 970101. Kitchen/bathroom (1 ) remodel for residential buildings (no structural changes). Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (15 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. Window (11 ) and door (8) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B.
Permit Issued
Issued on 5/9/2025
Issuing Office
Current Status
Permit Finaled on 5/11/2026

Permit Application Status History

Issued 5/9/2025 APPLICANT
Permit Finaled 5/8/2026 LILIANA PORTILLO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Prime Construction Services Inc; Lic. No.: 985031-B 865 S MILIKEN AVE UNIT A      ONTARIO, CA 91761

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 11/25/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 2/18/2026 Approved LILIANA PORTILLO
Insulation 2/18/2026 Approved LILIANA PORTILLO
Rough-Elec/Plmb/HVAC 2/18/2026 Approved LILIANA PORTILLO
Drywall Nailing 2/24/2026 Approved GEM DE OCAMPO
Final 5/8/2026 Permit Finaled LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 5/8/2026 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 5/8/2026 Approved LILIANA PORTILLO