3219 N SHEFFIELD AVE 90032
Certificate Information: 3219 N SHEFFIELD AVE 90032
- Application / Permit
- 25016-20000-14798
- Plan Check / Job No.
- X25VN12797
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Window (13 ) and door (10 ) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (16 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. Kitchen/bathroom (1) remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 5/9/2025
- Issuing Office
- Current Status
- Permit Finaled on 4/1/2026
Permit Application Status History
| Issued | 5/9/2025 | APPLICANT |
| Permit Finaled | 3/31/2026 | LILIANA PORTILLO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Prime Construction Services Inc; Lic. No.: 985031-B | 865 S MILIKEN AVE UNIT A ONTARIO, CA 91761 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 9/24/2025 | Approved | LILIANA PORTILLO |
| BUILDING-Rough-Frame | 11/20/2025 | Approved | LILIANA PORTILLO |
| Insulation | 11/20/2025 | Approved | LILIANA PORTILLO |
| Drywall Nailing | 12/4/2025 | Approved | LILIANA PORTILLO |
| Interior/Exterior Lathing | 12/4/2025 | Approved | LILIANA PORTILLO |
| Final | 3/16/2026 | Corrections Issued | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 3/16/2026 | SGSOV Not Ready | LILIANA PORTILLO |
| Smoke Detectors | 3/16/2026 | Approved | LILIANA PORTILLO |
| Final | 3/31/2026 | Permit Finaled | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 3/31/2026 | SGSOV Approved | LILIANA PORTILLO |