3219 N SHEFFIELD AVE 90032

Certificate Information: 3219 N SHEFFIELD AVE 90032

Application / Permit
25016-20000-14798
Plan Check / Job No.
X25VN12797
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Window (13 ) and door (10 ) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (16 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. Kitchen/bathroom (1) remodel for residential buildings (no structural changes).
Permit Issued
Issued on 5/9/2025
Issuing Office
Current Status
Permit Finaled on 4/1/2026

Permit Application Status History

Issued 5/9/2025 APPLICANT
Permit Finaled 3/31/2026 LILIANA PORTILLO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Prime Construction Services Inc; Lic. No.: 985031-B 865 S MILIKEN AVE UNIT A      ONTARIO, CA 91761

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 9/24/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 11/20/2025 Approved LILIANA PORTILLO
Insulation 11/20/2025 Approved LILIANA PORTILLO
Drywall Nailing 12/4/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 12/4/2025 Approved LILIANA PORTILLO
Final 3/16/2026 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 3/16/2026 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 3/16/2026 Approved LILIANA PORTILLO
Final 3/31/2026 Permit Finaled LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 3/31/2026 SGSOV Approved LILIANA PORTILLO