1328 S BARRY AVE 1-9 90025

Certificate Information: 1328 S BARRY AVE 1-9 90025

Application / Permit
25016-20000-14224
Plan Check / Job No.
B25VN12311
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
REMOVE AND REPLACE EXISTING EXTERIOR STAIRS WITH STEEL AND PORTION OF EX WALKWAY GUARDRAILS @ 2ND FLOOR PER PLAN. ALL WORK AT THE SAME LOCATION, SIZE & HEIGHT.
Permit Issued
Issued on 5/28/2025
Issuing Office
Valley
Current Status
Permit Finaled on 1/15/2026

Permit Application Status History

Submitted 5/2/2025 APPLICANT
Assigned to Plan Check Engineer 5/8/2025 HAYATO TSUCHIYA
Corrections Issued 5/8/2025 HAYATO TSUCHIYA
Building Plans Picked Up 5/13/2025 APPLICANT
Applicant returned to address corrections 5/23/2025 MIROOSH KHACHATOORIAN
Plan Check Approved 5/28/2025 OMAR GARNICA
Issued 5/28/2025 APPLICANT
Permit Finaled 1/15/2026 CASIMIR BRITTON

Permit Application Clearance Information

"Q" conditions Cleared 5/23/2025 ALEX VELA

Contact Information

Contractor Weinstein Construction Corporation; Lic. No.: 630439-B 15102 RAYMER STREET      VAN NUYS, CA 91405
Engineer Tajvidi,, Seyed Mohammad; Lic. No.: C84559 9163 LEROY STREET      SAN GABRIEL, CA 91775

Inspector Information

CASIMIR BRITTON, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI
SHAVONNE ESPINOZA, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/6/2025 Partial Approval CASIMIR BRITTON
Excavation/Setback/Form/Re-Bar 7/2/2025 Conditional Approval CASIMIR BRITTON
Wood Frame 7/2/2025 Not Ready for Inspection CASIMIR BRITTON
Floor/Roof Diaphrgm/Shear Wall 7/18/2025 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 7/23/2025 Partial Approval CASIMIR BRITTON
Final 11/14/2025 Not Ready for Inspection CASIMIR BRITTON
SGSOV-Seismic Gas S/O Valve 11/14/2025 SGSOV Not Ready CASIMIR BRITTON
Smoke Detectors 11/14/2025 Not Ready for Inspection CASIMIR BRITTON
Final 12/22/2025 Not Ready for Inspection VASIL MIHALEV
SGSOV-Seismic Gas S/O Valve 12/22/2025 SGSOV Not Required VASIL MIHALEV
Smoke Detectors 12/22/2025 Approved VASIL MIHALEV
Final 1/13/2026 Not Ready for Inspection CASIMIR BRITTON
Final 1/15/2026 Permit Finaled CASIMIR BRITTON