1328 S BARRY AVE 1-9 90025
Certificate Information: 1328 S BARRY AVE 1-9 90025
- Application / Permit
- 25016-20000-14224
- Plan Check / Job No.
- B25VN12311
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- REMOVE AND REPLACE EXISTING EXTERIOR STAIRS WITH STEEL AND PORTION OF EX WALKWAY GUARDRAILS @ 2ND FLOOR PER PLAN. ALL WORK AT THE SAME LOCATION, SIZE & HEIGHT.
- Permit Issued
- Issued on 5/28/2025
- Issuing Office
- Valley
- Current Status
- Permit Finaled on 1/15/2026
Permit Application Status History
| Submitted | 5/2/2025 | APPLICANT |
| Assigned to Plan Check Engineer | 5/8/2025 | HAYATO TSUCHIYA |
| Corrections Issued | 5/8/2025 | HAYATO TSUCHIYA |
| Building Plans Picked Up | 5/13/2025 | APPLICANT |
| Applicant returned to address corrections | 5/23/2025 | MIROOSH KHACHATOORIAN |
| Plan Check Approved | 5/28/2025 | OMAR GARNICA |
| Issued | 5/28/2025 | APPLICANT |
| Permit Finaled | 1/15/2026 | CASIMIR BRITTON |
Permit Application Clearance Information
| "Q" conditions | Cleared | 5/23/2025 | ALEX VELA |
Contact Information
| Contractor | Weinstein Construction Corporation; Lic. No.: 630439-B | 15102 RAYMER STREET VAN NUYS, CA 91405 |
| Engineer | Tajvidi,, Seyed Mohammad; Lic. No.: C84559 | 9163 LEROY STREET SAN GABRIEL, CA 91775 |
Inspector Information
| CASIMIR BRITTON, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
| SHAVONNE ESPINOZA, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 6/6/2025 | Partial Approval | CASIMIR BRITTON |
| Excavation/Setback/Form/Re-Bar | 7/2/2025 | Conditional Approval | CASIMIR BRITTON |
| Wood Frame | 7/2/2025 | Not Ready for Inspection | CASIMIR BRITTON |
| Floor/Roof Diaphrgm/Shear Wall | 7/18/2025 | Partial Approval | CASIMIR BRITTON |
| Interior/Exterior Lathing | 7/23/2025 | Partial Approval | CASIMIR BRITTON |
| Final | 11/14/2025 | Not Ready for Inspection | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 11/14/2025 | SGSOV Not Ready | CASIMIR BRITTON |
| Smoke Detectors | 11/14/2025 | Not Ready for Inspection | CASIMIR BRITTON |
| Final | 12/22/2025 | Not Ready for Inspection | VASIL MIHALEV |
| SGSOV-Seismic Gas S/O Valve | 12/22/2025 | SGSOV Not Required | VASIL MIHALEV |
| Smoke Detectors | 12/22/2025 | Approved | VASIL MIHALEV |
| Final | 1/13/2026 | Not Ready for Inspection | CASIMIR BRITTON |
| Final | 1/15/2026 | Permit Finaled | CASIMIR BRITTON |