16827 W TRIBUNE ST 91344

Certificate Information: 16827 W TRIBUNE ST 91344

Application / Permit
25016-20000-07531
Plan Check / Job No.
B25VN07193
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN WITH REMOVAL OF WALL. NEW SLIDING DOOR AND WINDOWS IN THE (E) LIVING ROOM, AND ELARGE THE PRIMARY BATHROOM.
Permit Issued
Issued on 3/26/2025
Issuing Office
Current Status
Permit Finaled on 7/15/2025

Permit Application Status History

Submitted 3/17/2025 APPLICANT
Assigned to Plan Check Engineer 3/17/2025 LUISANGEL VALENZUELA
Corrections Issued 3/17/2025 LUISANGEL VALENZUELA
Plan Check Approved 3/26/2025 ALEC MOUSAKHANIAN
Issued 3/26/2025 APPLICANT
Permit Finaled 7/15/2025 CHRISTOPHER ROJAS

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Mc Construction And Design; Lic. No.: 1055077-B 16200 VENTURA BLVD STE #401      ENCINO, CA 91436
Engineer Standley,, Craig Erick; Lic. No.: C87675 60 VIA CARATAMA      SAN CLEMENTE, CA 92673

Inspector Information

CHRISTOPHER ROJAS, (818) 374-1160 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 4/16/2025 Conditional Approval NICHOLAS TROWBRIDGE
ELECTRICAL-Rough 4/16/2025 Corrections Issued NICHOLAS TROWBRIDGE
PLUMBING-Rough 4/16/2025 Approved NICHOLAS TROWBRIDGE
BUILDING-Rough-Frame 4/18/2025 Conditional Approval NICHOLAS TROWBRIDGE
ELECTRICAL-Rough 4/18/2025 Approved NICHOLAS TROWBRIDGE
Shower Pan 4/18/2025 Approved NICHOLAS TROWBRIDGE
Insulation 4/22/2025 Corrections Issued LOUIS ESCOTO
Interior/Exterior Lathing 4/22/2025 Approved LOUIS ESCOTO
BUILDING-Rough-Frame 4/24/2025 Approved LOUIS ESCOTO
Drywall Nailing 4/24/2025 Approved LOUIS ESCOTO
Insulation 4/24/2025 Approved LOUIS ESCOTO
Footing/Foundation/Slab 6/13/2025 Approved CHRISTOPHER ROJAS
BUILDING-Rough-Frame 6/23/2025 Partial Approval CHRISTOPHER ROJAS
PLUMBING-Rough 6/23/2025 Partial Approval CHRISTOPHER ROJAS
Drywall Nailing 6/30/2025 Approved CHRISTOPHER ROJAS
Insulation 6/30/2025 Approved CHRISTOPHER ROJAS
Interior/Exterior Lathing 6/30/2025 Approved CHRISTOPHER ROJAS
Final 7/2/2025 Not Ready for Inspection CHRISTOPHER ROJAS
SGSOV-Seismic Gas S/O Valve 7/2/2025 SGSOV Approved CHRISTOPHER ROJAS
Smoke Detectors 7/2/2025 Corrections Issued CHRISTOPHER ROJAS
Final 7/15/2025 Permit Finaled CHRISTOPHER ROJAS
Smoke Detectors 7/15/2025 Approved CHRISTOPHER ROJAS