880 N TEAKWOOD ROAD 90049

Certificate Information: 880 N TEAKWOOD ROAD 90049

Application / Permit
25016-20000-05178
Plan Check / Job No.
B25VN04994
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO (E) SFD. CREATE 1 ADDITIONAL BEDROOM AND 4 FULL BATHROOMS.TOTAL OF 4 BEDROOMS AND BATHROOMS. PER ENGINEER DESIGN.
Permit Issued
Issued on 4/1/2025
Issuing Office
Valley
Current Status
Permit Finaled on 3/10/2026

Permit Application Status History

Submitted 2/25/2025 APPLICANT
Assigned to Plan Check Engineer 3/3/2025 JESSE ARELLANO
Corrections Issued 3/4/2025 JESSE ARELLANO
Building Plans Picked Up 3/5/2025 APPLICANT
Issued 4/1/2025 APPLICANT
Permit Finaled 3/10/2026 KEVIN SARGSYAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/14/2025 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 3/18/2025 DARIN LAM
Sewer availability Cleared 3/18/2025 DARIN LAM

Contact Information

Contractor Owner-Builder       ,
Engineer Mobed,, Ashkan; Lic. No.: C92493 23450 KITTREDGE ST      WEST HILLS, CA 91307

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 7/30/2025 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 7/30/2025 Corrections Issued KEVIN SARGSYAN
Gas Test 7/30/2025 Partial Approval KEVIN SARGSYAN
HVAC-Rough 7/30/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 7/30/2025 Corrections Issued KEVIN SARGSYAN
Wood Frame 7/30/2025 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 8/5/2025 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/5/2025 Partial Approval KEVIN SARGSYAN
Gas Test 8/5/2025 Approved KEVIN SARGSYAN
PLUMBING-Rough 8/5/2025 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 8/18/2025 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 8/18/2025 Approved STEPHANIE SWANSON
Interior/Exterior Lathing 8/18/2025 Conditional Approval STEPHANIE SWANSON
PLUMBING-Rough 8/18/2025 Approved STEPHANIE SWANSON
Shower Pan 8/18/2025 Approved STEPHANIE SWANSON
BUILDING-Rough-Frame 8/22/2025 Approved KEVIN SARGSYAN
Insulation 8/22/2025 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 8/22/2025 Approved KEVIN SARGSYAN
Drywall Nailing 8/26/2025 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/26/2025 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/29/2025 Approved KEVIN SARGSYAN
ELECTRICAL-Final 2/23/2026 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 2/23/2026 Corrections Issued KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 2/23/2026 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 2/23/2026 Approved KEVIN SARGSYAN
Final 3/10/2026 Permit Finaled KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 3/10/2026 SGSOV Approved KEVIN SARGSYAN