6154 N ELLENVIEW AVE 91367

Certificate Information: 6154 N ELLENVIEW AVE 91367

Application / Permit
25016-20000-04808
Plan Check / Job No.
B25VN04505
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) 2-STORY SINGLE FAMILY DWELLING. ALL WORK DONE PER ENGINEERING.
Permit Issued
Issued on 4/9/2025
Issuing Office
Valley
Current Status
Issued on 4/9/2025

Permit Application Status History

Submitted 2/20/2025 APPLICANT
Assigned to Plan Check Engineer 2/26/2025 ARTIN ZARUKIAN
Corrections Issued 3/3/2025 ARTIN ZARUKIAN
Building Plans Picked Up 3/5/2025 APPLICANT
Applicant returned to address corrections 3/27/2025 ISIS ARGUETA
Plan Check Approved 4/9/2025 GURUNATH NESARAJAH
Issued 4/9/2025 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/27/2025 MANUEL TEJADA

Contact Information

Contractor Acer Fire Protection Inc; Lic. No.: 1047478-B 4661 MANE STREET      MONTCLAIR, CA 91763
Engineer Castillo,, Margarito; Lic. No.: S4808 1205 PINE AVE   SUITE 201    LONG BEACH, CA 90813

Inspector Information

GEVORK IPCHYAN, (818) 774-4308 Office Hours: 7:00-8:00 AM MON-FRI
TROY SANDERS, (818) 774-4308 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/23/2025 Conditional Approval TROY SANDERS
ELECTRICAL-Rough 6/23/2025 Not Ready for Inspection GEVORK IPCHYAN
Excavation/Setback/Form/Re-Bar 6/23/2025 Corrections Issued GEVORK IPCHYAN
Floor/Roof Diaphrgm/Shear Wall 6/23/2025 Not Ready for Inspection GEVORK IPCHYAN
Footing/Foundation/Slab 6/23/2025 Not Ready for Inspection GEVORK IPCHYAN
HVAC-Rough 6/23/2025 Not Ready for Inspection GEVORK IPCHYAN
PLUMBING-Rough 6/23/2025 Not Ready for Inspection GEVORK IPCHYAN
Footing/Foundation/Slab 7/24/2025 Approved JUAN ALVARADO
ELECTRICAL-Rough 7/29/2025 Not Ready for Inspection GEVORK IPCHYAN
HVAC-Rough 7/29/2025 Partial Approval GEVORK IPCHYAN
PLUMBING-Rough 7/29/2025 Partial Approval GEVORK IPCHYAN
Drywall Nailing 8/4/2025 Not Ready for Inspection GEVORK IPCHYAN
Floor/Roof Diaphrgm/Shear Wall 8/4/2025 Partial Approval GEVORK IPCHYAN
BUILDING-Rough-Frame 8/8/2025 Approved GEVORK IPCHYAN
ELECTRICAL-Rough 8/8/2025 Approved GEVORK IPCHYAN
Floor/Roof Diaphrgm/Shear Wall 8/8/2025 Partial Approval GEVORK IPCHYAN
HVAC-Rough 8/8/2025 Approved GEVORK IPCHYAN
PLUMBING-Rough 8/8/2025 Approved GEVORK IPCHYAN
Drywall Nailing 8/13/2025 Partial Approval GEVORK IPCHYAN
Drywall Nailing 9/8/2025 Approved GEVORK IPCHYAN
Interior/Exterior Lathing 10/9/2025 Partial Approval GEVORK IPCHYAN
Final 4/6/2026 Corrections Issued GEVORK IPCHYAN
SGSOV-Seismic Gas S/O Valve 4/6/2026 SGSOV Approved GEVORK IPCHYAN
Smoke Detectors 4/6/2026 Approved GEVORK IPCHYAN