12841 N DE HAVEN AVE 91342

Certificate Information: 12841 N DE HAVEN AVE 91342

Application / Permit
25016-20000-04739
Plan Check / Job No.
B25VN04372
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE AND NEW ADDITION TO ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(b)(1). PER ENGINEER DESIGN.
Permit Issued
Issued on 7/19/2025
Issuing Office
Current Status
CofO Issued on 12/31/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/24/2025 APPLICANT
Assigned to Plan Check Engineer 2/28/2025 MIROOSH KHACHATOORIAN
Corrections Issued 3/3/2025 MIROOSH KHACHATOORIAN
Applicant returned to address corrections 6/4/2025 ISIS ARGUETA
Applicant returned to address corrections 7/3/2025 ISIS ARGUETA
Plan Check Approved 7/17/2025 MIROOSH KHACHATOORIAN
Issued 7/19/2025 APPLICANT
CofO in Progress 12/12/2025 KEVIN BERBERYAN
Permit Finaled 12/31/2025 RUBEN SALAS
CofO Issued 12/31/2025 RUBEN SALAS
Permit Finaled 12/31/2025 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 3/8/2025 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 3/8/2025 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 3/11/2025 LEE GUILBEAUX
Construction near power lines Cleared 4/29/2025 GEVORK KARAPETYAN
Construction within easement Cleared 4/29/2025 GEVORK KARAPETYAN
Construction near power lines Cleared 6/26/2025 GEVORK KARAPETYAN
Roof/Waste drainage to street Cleared 6/27/2025 LEE GUILBEAUX
Sewer availability Cleared 6/27/2025 LEE GUILBEAUX
Sewer availability Cleared 6/27/2025 LEE GUILBEAUX

Contact Information

Contractor Owner-Builder       ,
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 7/24/2025 Partial Approval KEVIN BERBERYAN
Footing/Foundation/Slab 7/28/2025 Approved KEVIN BERBERYAN
Floor/Roof Diaphrgm/Shear Wall 8/20/2025 Corrections Issued KEVIN BERBERYAN
BUILDING-Rough-Frame 8/21/2025 Approved KEVIN BERBERYAN
ELECTRICAL-Rough 8/21/2025 Approved KEVIN BERBERYAN
HVAC-Rough 8/21/2025 Approved KEVIN BERBERYAN
PLUMBING-Rough 8/21/2025 Approved KEVIN BERBERYAN
Shower Pan 8/21/2025 Approved KEVIN BERBERYAN
Insulation 8/25/2025 Not Ready for Inspection KEVIN BERBERYAN
Interior/Exterior Lathing 8/25/2025 Approved KEVIN BERBERYAN
Insulation 8/26/2025 Approved KEVIN BERBERYAN
Insulation 8/26/2025 Approved RAUL OLAGI
Insulation 8/27/2025 Partial Inspection KEVIN BERBERYAN
Drywall Nailing 8/29/2025 Approved JENNIFER RABUCHIN
Green Building Rough 8/29/2025 Approved JENNIFER RABUCHIN
Final 10/1/2025 Corrections Issued KEVIN BERBERYAN
Green Building Final 10/1/2025 Not Ready for Inspection KEVIN BERBERYAN
SGSOV-Seismic Gas S/O Valve 10/1/2025 SGSOV No Gas KEVIN BERBERYAN
Smoke Detectors 10/1/2025 Approved KEVIN BERBERYAN
Final 10/20/2025 Corrections Issued KEVIN BERBERYAN
Green Building Final 10/20/2025 Not Ready for Inspection KEVIN BERBERYAN
Final 12/12/2025 OK to Issue CofO KEVIN BERBERYAN
Green Building Final 12/12/2025 Approved KEVIN BERBERYAN