7565 N MELVIN AVE 91335
Certificate Information: 7565 N MELVIN AVE 91335
- Application / Permit
- 25016-10000-27379
- Plan Check / Job No.
- X25LA38102
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _22_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B. (18) Window change-out (same size & type) for residential buildings . Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. (1) Kitchen/(1)bathroom remodel for residential buildings (no structural changes) MECHANICAL, ELECTRICAL, PLUMBING INCLUDED
- Permit Issued
- Issued on 9/10/2025
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 11/17/2025
Permit Application Status History
| Issued | 9/10/2025 | APPLICANT |
| Permit Finaled | 11/15/2025 | GEVORK IPCHYAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Builder Repair Installation; Lic. No.: 1141849-B | 25039 WINTERGREEN COURT STEVENSON RANCH, CA 91381 |
Inspector Information
| ARUTYUN MADATYAN, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JUAN ALVARADO, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 9/11/2025 | Approved | JUAN ALVARADO |
| Interior/Exterior Lathing | 10/1/2025 | Not Ready for Inspection | JUAN ALVARADO |
| Shower Pan | 10/1/2025 | Approved | JUAN ALVARADO |
| BUILDING-Rough-Frame | 10/8/2025 | Approved | JUAN ALVARADO |
| ELECTRICAL-Rough | 10/8/2025 | Approved | JUAN ALVARADO |
| HVAC-Rough | 10/8/2025 | Approved | JUAN ALVARADO |
| Interior/Exterior Lathing | 10/8/2025 | Approved | JUAN ALVARADO |
| PLUMBING-Rough | 10/8/2025 | Approved | JUAN ALVARADO |
| ELECTRICAL-Final | 11/8/2025 | Not Ready for Inspection | GEVORK IPCHYAN |
| HVAC-Final | 11/8/2025 | Not Ready for Inspection | GEVORK IPCHYAN |
| PLUMBING-Final | 11/8/2025 | Not Ready for Inspection | GEVORK IPCHYAN |
| ELECTRICAL-Final | 11/13/2025 | Corrections Issued | JUAN ALVARADO |
| HVAC-Final | 11/13/2025 | Approved | JUAN ALVARADO |
| PLUMBING-Final | 11/13/2025 | Approved | JUAN ALVARADO |
| Smoke Detectors | 11/13/2025 | Corrections Issued | JUAN ALVARADO |
| BUILDING-Rough-Frame | 11/15/2025 | Approved | GEVORK IPCHYAN |
| Final | 11/15/2025 | Permit Finaled | GEVORK IPCHYAN |
| SGSOV-Seismic Gas S/O Valve | 11/15/2025 | SGSOV Approved | GEVORK IPCHYAN |
| Smoke Detectors | 11/15/2025 | Approved | GEVORK IPCHYAN |