4523 W LEXINGTON AVE 90029

Certificate Information: 4523 W LEXINGTON AVE 90029

Application / Permit
25016-10000-25251
Plan Check / Job No.
B25LA34817
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED TRELLIS ROOFED DECK ADDITION, ROOF FRAMING CHANGE FROM FLAT TO GABLE ROOF AND INTERIOR REMODEL OF ENTIRE SFD.
Permit Issued
Issued on 11/4/2025
Issuing Office
Metro
Current Status
Permit Finaled on 2/26/2026

Permit Application Status History

Submitted 8/20/2025 APPLICANT
Assigned to Plan Check Engineer 8/25/2025 LAWRENCE QUIRANTE
Corrections Issued 8/25/2025 LAWRENCE QUIRANTE
Building Plans Picked Up 8/29/2025 APPLICANT
Plan Check Approved 10/29/2025 ZAW HAN
Issued 11/4/2025 APPLICANT
Permit Finaled 2/17/2026 FREDDIE RIVERA
CofO in Progress 2/26/2026 FREDDIE RIVERA
No Progress 2/26/2026 OSVALDO PARAMO
CofO in Progress 2/26/2026 OSVALDO PARAMO

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 9/6/2025 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 9/25/2025 ERIK BEASLEY
Specific Plan Cleared 10/28/2025 NASHYA JENSEN
Grading Pre-Inspection Cleared 10/29/2025 RUSSELL BONVOULOIR

Contact Information

Contractor Gnet Construction; Lic. No.: 1139528-B 1056 1/2 S SERRANO AVENUE      LOS ANGELES, CA 90006
Engineer Yoon,, Philip; Lic. No.: C94664 4551 1/2 BRIGGS AVE      LOS ANGELES, CA 91214

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/19/2025 Conditional Approval FREDDIE RIVERA
Footing/Foundation/Slab 11/20/2025 Corrections Issued SALVADOR MARTINEZ
Excavation/Setback/Form/Re-Bar 11/24/2025 Approved FREDDIE RIVERA
PLUMBING-Rough 12/4/2025 Partial Approval FREDDIE RIVERA
Sewer 12/4/2025 Partial Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 12/8/2025 Partial Approval FREDDIE RIVERA
Insulation 12/8/2025 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 12/16/2025 Approved FREDDIE RIVERA
Interior/Exterior Lathing 12/16/2025 Partial Approval FREDDIE RIVERA
Rough-Elec/Plmb/HVAC 12/16/2025 Approved FREDDIE RIVERA
Insulation 12/19/2025 Partial Approval GEM DE OCAMPO
Interior/Exterior Lathing 12/19/2025 Corrections Issued GEM DE OCAMPO
Insulation 12/23/2025 Approved FREDDIE RIVERA
Interior/Exterior Lathing 12/23/2025 Partial Approval FREDDIE RIVERA
Drywall Nailing 1/5/2026 Approved FREDDIE RIVERA
Shower Pan 1/5/2026 Approved FREDDIE RIVERA
Interior/Exterior Lathing 1/12/2026 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 2/4/2026 Approved FREDDIE RIVERA
Final 2/4/2026 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 2/4/2026 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 2/4/2026 SGSOV Approved FREDDIE RIVERA
Smoke Detectors 2/4/2026 Approved FREDDIE RIVERA
Final 2/17/2026 Permit Finaled FREDDIE RIVERA