1732 S BUTLER AVE 90025

Certificate Information: 1732 S BUTLER AVE 90025

Application / Permit
25016-10000-21846
Plan Check / Job No.
B25LA29215
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
eplan: Existing 3 story apartment building. BALCONY REPAIR AT EAST SIDE OF BUILDING & BALCONY WATERPROOFING AT NORTH SIDE OF BUILDING
Permit Issued
Issued on 8/19/2025
Issuing Office
Current Status
Permit Finaled on 11/3/2025

Permit Application Status History

Submitted 7/16/2025 APPLICANT
Assigned to Plan Check Engineer 7/18/2025 TSE MING HUANG
Corrections Issued 7/19/2025 TSE MING HUANG
Applicant returned to address corrections 7/30/2025 TSE MING HUANG
Plan Check Approved 8/7/2025 TSE MING HUANG
Plan Check Approved 8/15/2025 TSE MING HUANG
Issued 8/19/2025 APPLICANT
Permit Finaled 11/3/2025 CASIMIR BRITTON

Permit Application Clearance Information

"Q" conditions Cleared 7/21/2025 ALEX VELA
Tenant Habitability Plan Cleared 7/30/2025 KORNEL LELEA

Contact Information

Contractor Tesh Incorporated; Lic. No.: 310779-B       ,
Engineer Ding,, Wenzhuo; Lic. No.: C82891 5205 SUNNY POINT PL      RANCHO PALOS VERDES, CA 90275

Inspector Information

CASIMIR BRITTON, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI
SHAVONNE ESPINOZA, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 8/21/2025 Corrections Issued DANIEL VARNUM
Wood Frame 9/8/2025 Not Ready for Inspection FARHAD DADBIN
Wood Frame 9/22/2025 Not Ready for Inspection CASIMIR BRITTON
Floor/Roof Diaphrgm/Shear Wall 9/26/2025 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 10/3/2025 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 10/10/2025 Not Ready for Inspection DANIEL VARNUM
Final 10/16/2025 Not Ready for Inspection CASIMIR BRITTON
Interior/Exterior Lathing 10/16/2025 Approved CASIMIR BRITTON
SGSOV-Seismic Gas S/O Valve 10/16/2025 SGSOV Not Ready CASIMIR BRITTON
Smoke Detectors 10/16/2025 Not Ready for Inspection CASIMIR BRITTON
Final 10/23/2025 Not Ready for Inspection CASIMIR BRITTON
SGSOV-Seismic Gas S/O Valve 10/23/2025 SGSOV Approved CASIMIR BRITTON
Smoke Detectors 10/23/2025 Approved CASIMIR BRITTON
Final 11/3/2025 Permit Finaled CASIMIR BRITTON