1007 W 24TH ST 90007

Certificate Information: 1007 W 24TH ST 90007

Application / Permit
25016-10000-19871
Plan Check / Job No.
B25LA25985
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: Exterior/Interior Alteration to (E) SFD . Reframe existing roof and fire damage repair work at the 2nd Floor . Including reframing majority of roof system . Work at 2nd floor for exterior siding, interior drywall at ceiling, sister ceiling joists .
Permit Issued
Issued on 7/29/2025
Issuing Office
Current Status
Permit Finaled on 5/12/2026

Permit Application Status History

Submitted 6/24/2025 APPLICANT
Assigned to Plan Check Engineer 6/25/2025 GEORGE ALVAREZ
Corrections Issued 6/26/2025 GEORGE ALVAREZ
Applicant returned to address corrections 7/17/2025 GEORGE ALVAREZ
Plan Check Approved 7/28/2025 GEORGE ALVAREZ
Issued 7/29/2025 APPLICANT
Permit Finaled 5/12/2026 ALEJANDRO DE ARTOLA

Permit Application Clearance Information

"Q" conditions Cleared 7/7/2025 FIPE LEILUA
Eng Process Fee Ord 176,300 Cleared 7/7/2025 COLIN LOREDO
City Hist. Cultural Monument Cleared 7/8/2025 LAMBERT GIESSINGER
HPOZ Cleared 7/8/2025 LAMBERT GIESSINGER
Hist. Property Cntrct Mgr Appr Cleared 7/8/2025 LAMBERT GIESSINGER
Historic monument Cleared 7/8/2025 LAMBERT GIESSINGER
Supp. Use District POD/CDO/TDO Cleared 7/15/2025 FIPE LEILUA
Roof/Waste drainage to street Cleared 7/16/2025 DAVID LOPEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Arutyunyan,, Vladimir; Lic. No.: NA92714       ,

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 10/21/2025 Corrections Issued ALEJANDRO DE ARTOLA
ELECTRICAL-Rough 11/6/2025 Approved ALEJANDRO DE ARTOLA
HVAC-Rough 11/6/2025 Corrections Issued ALEJANDRO DE ARTOLA
PLUMBING-Rough 11/6/2025 Corrections Issued ALEJANDRO DE ARTOLA
BUILDING-Rough-Frame 11/18/2025 Corrections Issued ALEJANDRO DE ARTOLA
Rough-Elec/Plmb/HVAC 11/18/2025 Approved ALEJANDRO DE ARTOLA
BUILDING-Rough-Frame 11/21/2025 Approved ALEJANDRO DE ARTOLA
Insulation 11/21/2025 Approved ALEJANDRO DE ARTOLA
Drywall Nailing 12/5/2025 Approved ANTHONY RAMOS
Final 5/12/2026 Permit Finaled ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 5/12/2026 SGSOV Approved ALEJANDRO DE ARTOLA
Smoke Detectors 5/12/2026 Approved ALEJANDRO DE ARTOLA