3017 1/2 E EAGLE ST 90063
Certificate Information: 3017 1/2 E EAGLE ST 90063
- Application / Permit
- 25016-10000-19146
- Plan Check / Job No.
- X25LA24956
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- (10) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing _15_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B
- Permit Issued
- Issued on 6/16/2025
- Issuing Office
- Current Status
- Permit Finaled on 4/2/2026
Permit Application Status History
| Issued | 6/16/2025 | APPLICANT |
| Permit Finaled | 4/2/2026 | FREDDIE RIVERA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Lomeli Construction; Lic. No.: 892903-B | 3228 GRIFFEN AVE LOS ANGELES, CA 90031 |
Inspector Information
| FREDDIE RIVERA, (213) 202-3437 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 9/8/2025 | Partial Approval | FREDDIE RIVERA |
| Floor/Roof Diaphrgm/Shear Wall | 10/8/2025 | Partial Approval | FREDDIE RIVERA |
| Interior/Exterior Lathing | 10/8/2025 | Partial Approval | FREDDIE RIVERA |
| Final | 3/20/2026 | Partial Inspection | FREDDIE RIVERA |
| Floor/Roof Diaphrgm/Shear Wall | 3/20/2026 | Approved | FREDDIE RIVERA |
| SGSOV-Seismic Gas S/O Valve | 3/20/2026 | SGSOV Not Ready | FREDDIE RIVERA |
| Smoke Detectors | 3/20/2026 | Approved | FREDDIE RIVERA |
| Final | 4/2/2026 | Permit Finaled | FREDDIE RIVERA |
| SGSOV-Seismic Gas S/O Valve | 4/2/2026 | SGSOV Approved | FREDDIE RIVERA |