3920 E PAIGE ST 90031
Certificate Information: 3920 E PAIGE ST 90031
- Application / Permit
- 25016-10000-18371
- Plan Check / Job No.
- X25LA23756
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes (not including decks). (1) Kitchen/ (2) bathroom remodel for residential buildings (no structural changes). MEPs included. Replace drywall (no new walls added) for single family dwellings and duplexes only. (12) Window and (4) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 6/6/2025
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 2/25/2026
Permit Application Status History
| Issued | 6/6/2025 | APPLICANT |
| Permit Finaled | 2/24/2026 | DAVID WILLIAMS |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Resourceful Construction Inc; Lic. No.: 1003215-B | 1958 AVON STREET LOS ANGELES, CA 90026 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 8/27/2025 | Approved | LILIANA PORTILLO |
| ELECTRICAL-Rough | 8/27/2025 | Approved | LILIANA PORTILLO |
| Gas Test | 8/27/2025 | Not Ready for Inspection | LILIANA PORTILLO |
| HVAC-Rough | 8/27/2025 | Corrections Issued | LILIANA PORTILLO |
| Interior/Exterior Lathing | 8/27/2025 | Partial Approval | LILIANA PORTILLO |
| PLUMBING-Rough | 8/27/2025 | Corrections Issued | LILIANA PORTILLO |
| HVAC-Rough | 8/29/2025 | Approved | LILIANA PORTILLO |
| PLUMBING-Rough | 8/29/2025 | Approved | LILIANA PORTILLO |
| Insulation | 9/10/2025 | Approved | GEM DE OCAMPO |
| Drywall Nailing | 10/3/2025 | Approved | GEM DE OCAMPO |
| Interior/Exterior Lathing | 10/18/2025 | Not Ready for Inspection | KEVIN SARGSYAN |
| Shower Pan | 10/18/2025 | Corrections Issued | KEVIN SARGSYAN |
| Interior/Exterior Lathing | 10/21/2025 | Approved | REGINA MENDEZ |
| Shower Pan | 10/21/2025 | Approved | REGINA MENDEZ |
| Final | 2/24/2026 | Permit Finaled | DAVID WILLIAMS |
| SGSOV-Seismic Gas S/O Valve | 2/24/2026 | SGSOV Approved | DAVID WILLIAMS |
| Smoke Detectors | 2/24/2026 | Approved | DAVID WILLIAMS |