7965 N DE GARMO AVE 91352
Certificate Information: 7965 N DE GARMO AVE 91352
- Application / Permit
- 25016-10000-16125
- Plan Check / Job No.
- X25LA20037
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _10_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B. Re-stucco for residential buildings. Kitchen/Bathroom remodel for residential buildings ( no structural changes ) ELECTRICAL AND PLUMBING INCLUDED 8 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 5/15/2025
- Issuing Office
- South Los Angeles
- Current Status
- Permit Finaled on 8/8/2025
Permit Application Status History
| Issued | 5/15/2025 | APPLICANT |
| Permit Finaled | 8/5/2025 | DAVID ANDERSON |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| MATTHEW NELSON, (818) 374-1168 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 7/19/2025 | Not Ready for Inspection | SEAN HAUPT |
| Final | 7/19/2025 | Not Ready for Inspection | SEAN HAUPT |
| Floor/Roof Diaphrgm/Shear Wall | 7/19/2025 | Approved | SEAN HAUPT |
| MERV13>=Final | 7/19/2025 | Not Ready for Inspection | SEAN HAUPT |
| MERV13>=Rough | 7/19/2025 | Not Ready for Inspection | SEAN HAUPT |
| SGSOV-Seismic Gas S/O Valve | 7/19/2025 | SGSOV Not Ready | SEAN HAUPT |
| Pre-Inspection | 7/23/2025 | Corrections Issued | WILLIAM WREN |
| Pre-Inspection | 7/24/2025 | Approved | WILLIAM WREN |
| Smoke Detectors | 7/24/2025 | Approved | WILLIAM WREN |
| Pre-Inspection | 7/28/2025 | Corrections Issued | DAVID MATSON |
| BUILDING-Rough-Frame | 8/5/2025 | Approved | DAVID ANDERSON |
| Final | 8/5/2025 | Permit Finaled | DAVID ANDERSON |
| MERV13>=Final | 8/5/2025 | Approved | DAVID ANDERSON |
| MERV13>=Rough | 8/5/2025 | Approved | DAVID ANDERSON |
| SGSOV-Seismic Gas S/O Valve | 8/5/2025 | SGSOV Approved | DAVID ANDERSON |