3741 S VINTON AVE 90034

Certificate Information: 3741 S VINTON AVE 90034

Application / Permit
25016-10000-09150
Plan Check / Job No.
B25LA11911
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Eplan: Soft-Story seismic retrofit per LABC Chapter 93: SOFT STORY SEISMIC REINFORCEMENT AT BUILDING PARKING GARAGE USING (1) SPECIAL CANTILEVERED COLUMN W/ GRADE BEAM AND (1) WOOD SHEAR WALL PER LABC CHAPTER 93.
Permit Issued
Issued on 9/4/2025
Issuing Office
Current Status
CofC Issued on 3/24/2026

Permit Application Status History

Submitted 3/31/2025 APPLICANT
Assigned to Plan Check Engineer 4/3/2025 HANS SANTIAGO
Corrections Issued 4/7/2025 HANS SANTIAGO
Quality Review Completed 4/10/2025 DANIEL CHAN
Applicant returned to address corrections 5/23/2025 HANS SANTIAGO
Plan Check Approved 8/10/2025 ANDREW SANTIAGO
Issued 9/4/2025 APPLICANT
OK for CofC 3/24/2026 VASIL MIHALEV
CofC Issued 3/24/2026 VASIL MIHALEV

Permit Application Clearance Information

ZI Cleared 8/4/2025 JASON CHAN
Tenant Habitability Plan Cleared 9/3/2025 ARIC DEFUSCO

Contact Information

Contractor Sturdy Builds Inc; Lic. No.: 1006879-B 21300 VICTORY BLVD SUITE 635      WOODLAND HILLS, CA 91367
Engineer Ding,, Wenzhuo; Lic. No.: C82891 5205 SUNNY POINT PL      RANCHO PALOS VERDES, CA 90275

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/22/2025 Approved RICARDO ROBLES
Reinforced Concrete Frame 10/22/2025 Approved RICARDO ROBLES
Structural Steel Frame 10/22/2025 Partial Approval RICARDO ROBLES
Floor/Roof Diaphrgm/Shear Wall 10/23/2025 Not Ready for Inspection RICARDO ROBLES
Structural Steel Frame 10/23/2025 Corrections Issued RICARDO ROBLES
Wood Frame 10/23/2025 Not Ready for Inspection RICARDO ROBLES
Wood Frame 10/24/2025 Approved RICARDO ROBLES
Deputy Wood Construction 10/27/2025 Conditional Approval RICARDO ROBLES
Final 10/27/2025 Not Ready for Inspection RICARDO ROBLES
Interior/Exterior Lathing 10/27/2025 Approved RICARDO ROBLES
METHANE-Final 10/27/2025 Approved RICARDO ROBLES
SGSOV-Seismic Gas S/O Valve 10/27/2025 SGSOV Not Ready RICARDO ROBLES
Smoke Detectors 10/27/2025 Not Ready for Inspection RICARDO ROBLES
Final 11/5/2025 Partial Approval RICARDO ROBLES
SGSOV-Seismic Gas S/O Valve 11/5/2025 SGSOV Approved RICARDO ROBLES
Smoke Detectors 11/5/2025 Approved RICARDO ROBLES
Deputy Reinf. Concrete 3/24/2026 Approved VASIL MIHALEV
Final 3/24/2026 OK for CofC VASIL MIHALEV