322 E GAGE AVE 90003
Certificate Information: 322 E GAGE AVE 90003
- Application / Permit
- 25016-10000-06985
- Plan Check / Job No.
- X25LA09690
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 23 Window and 9 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. 1 Kitchen/2 Bathroom remodel for residential buildings ( no structural changes )MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDED Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___2___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. Re-stucco for residential buildings.
- Permit Issued
- Issued on 3/13/2025
- Issuing Office
- South Los Angeles
- Current Status
- Permit Finaled on 6/23/2025
Permit Application Status History
| Issued | 3/13/2025 | APPLICANT |
| Permit Finaled | 6/23/2025 | REGINA MENDEZ |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| JOHN QUINTANILLA, (213) 792-6055 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 5/3/2025 | Approved | HERBERT GIRON |
| HVAC-Rough | 5/3/2025 | Corrections Issued | HERBERT GIRON |
| PLUMBING-Rough | 5/3/2025 | Corrections Issued | HERBERT GIRON |
| Drywall Nailing | 5/23/2025 | Approved | ANTHONY RAMOS |
| HVAC-Rough | 5/23/2025 | Approved | ANTHONY RAMOS |
| Insulation | 5/23/2025 | Approved | ANTHONY RAMOS |
| PLUMBING-Rough | 5/23/2025 | Approved | ANTHONY RAMOS |
| Final | 6/23/2025 | Permit Finaled | REGINA MENDEZ |
| SGSOV-Seismic Gas S/O Valve | 6/23/2025 | SGSOV Approved | REGINA MENDEZ |
| Smoke Detectors | 6/23/2025 | Approved | REGINA MENDEZ |