625 W 42ND PL 90037

Certificate Information: 625 W 42ND PL 90037

Application / Permit
25016-10000-04828
Plan Check / Job No.
X25LA06684
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(14) Window change-out (same size & type) for residential buildings . Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Kitchen/bathroom remodel for residential buildings (no structural changes) COMBINED WITH MECHANICAL, ELECTRICAL, AND PLUMBLING Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _22_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ). For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
Permit Issued
Issued on 2/20/2025
Issuing Office
Metro
Current Status
Permit Finaled on 7/31/2025

Permit Application Status History

Issued 2/20/2025 APPLICANT
Permit Finaled 7/30/2025 ANTHONY RAMOS

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Prieto & Galindo Incorporated; Lic. No.: 1025966-B 16436 GRAND AVE      BELLFLOWER, CA 90706

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 4/3/2025 Approved SABAS ALONSO
HVAC-Rough 4/3/2025 Approved SABAS ALONSO
PLUMBING-Rough 4/3/2025 Approved SABAS ALONSO
BUILDING-Rough-Frame 5/6/2025 Approved SABAS ALONSO
Green Building Rough 5/6/2025 Approved SABAS ALONSO
Interior/Exterior Lathing 5/6/2025 Partial Approval SABAS ALONSO
Insulation 5/9/2025 Approved SABAS ALONSO
Drywall Nailing 5/13/2025 Approved SABAS ALONSO
Shower Pan 5/13/2025 Approved SABAS ALONSO
Interior/Exterior Lathing 6/2/2025 Approved ANTHONY RAMOS
Final 7/24/2025 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 7/24/2025 SGSOV Not Ready SABAS ALONSO
Smoke Detectors 7/24/2025 Approved SABAS ALONSO
Final 7/30/2025 Permit Finaled ANTHONY RAMOS
SGSOV-Seismic Gas S/O Valve 7/30/2025 SGSOV Approved ANTHONY RAMOS