4147 S MCCLUNG DR 90008

Certificate Information: 4147 S MCCLUNG DR 90008

Application / Permit
25016-10000-04140
Plan Check / Job No.
B25LA05803
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
ePLAN: Soft-Story seismic retrofit per LABC Chapter 93: MANDATORY RETROFIT SOFT STORY OPEN FRONT PARKING GARAGE WITH LIVING UNITS ABOVE IN ACCORDANCE WITH THE SOFT STORY (DIV. '93) ORDINANCE ( ADD (N)-(6) SPECIAL CANTILEVERED COLUMNS AND (1) ORDINARY MOMENT FRAME WITH GRADE BEAMS
Permit Issued
Issued on 7/25/2025
Issuing Office
Current Status
Issued on 7/25/2025

Permit Application Status History

Submitted 2/14/2025 APPLICANT
Assigned to Plan Check Engineer 2/20/2025 HANS SANTIAGO
Corrections Issued 2/24/2025 HANS SANTIAGO
Quality Review Completed 3/3/2025 DANIEL CHAN
Applicant returned to address corrections 3/6/2025 HANS SANTIAGO
Plan Check Approved 4/24/2025 ANDREW SANTIAGO
Issued 7/25/2025 APPLICANT

Permit Application Clearance Information

HPOZ Cleared 4/17/2025 CHRISTINA PARK
City Hist. Cultural Monument Cleared 4/21/2025 RAFAEL FONTES
Tenant Habitability Plan Cleared 6/30/2025 KORNEL LELEA

Contact Information

Contractor Titan Contracting Services Inc; Lic. No.: 976552-B 13434 RAYMER STREET      NORTH HOLLYWOOD, CA 91605
Engineer Ding,, Wenzhuo; Lic. No.: C82891 5205 SUNNY POINT PL      RANCHO PALOS VERDES, CA 90275

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/12/2025 Corrections Issued DARRYL ARNOLD
Footing/Foundation/Slab 9/4/2025 Corrections Issued DARRYL ARNOLD
Structural Steel Frame 9/4/2025 Conditional Approval DARRYL ARNOLD
Wood Frame 9/4/2025 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 9/25/2025 Corrections Issued DARRYL ARNOLD
Final 10/9/2025 Conditional Approval DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/9/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 10/9/2025 Conditional Approval DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/10/2025 SGSOV Not Ready DARRYL ARNOLD
Structural Steel Frame 10/11/2025 Corrections Issued DARRYL ARNOLD
Final 1/8/2026 Partial Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 1/8/2026 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 1/8/2026 Partial Inspection DARRYL ARNOLD