252 S MARIPOSA AVE 90004

Certificate Information: 252 S MARIPOSA AVE 90004

Application / Permit
25016-10000-03258
Plan Check / Job No.
B25LA04478
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
EPLAN. BALCONY REPAIR AT (E) APARTMENT BLDG. PER ENGINEERING DESIGN.
Permit Issued
Issued on 2/20/2025
Issuing Office
Current Status
Permit Finaled on 9/17/2025

Permit Application Status History

Submitted 2/5/2025 APPLICANT
Assigned to Plan Check Engineer 2/11/2025 ALFREDO JARA
Corrections Issued 2/11/2025 ALFREDO JARA
Plan Check Approved 2/19/2025 ALFREDO JARA
Issued 2/20/2025 APPLICANT
Permit Finaled 9/15/2025 ALFREDO LOPEZ

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Dialog Group; Lic. No.: 1096446-B       ,
Engineer Arutyunyan,, Vladimir; Lic. No.: C92714 331 ARDEN AVE SUIT 201      GLENDALE, CA 91203

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 8/1/2025 Approved RONALD JIMENEZ
Wood Frame 8/1/2025 Approved RONALD JIMENEZ
Interior/Exterior Lathing 8/6/2025 Approved TIMOTHY POWELL
Final 9/3/2025 Not Ready for Inspection TIMOTHY POWELL
SGSOV-Seismic Gas S/O Valve 9/3/2025 SGSOV Not Ready TIMOTHY POWELL
Smoke Detectors 9/3/2025 Not Ready for Inspection TIMOTHY POWELL
Final 9/15/2025 Permit Finaled ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 9/15/2025 SGSOV Approved ALFREDO LOPEZ
Smoke Detectors 9/15/2025 Approved ALFREDO LOPEZ