4044 N COLLIS AVE 90032

Certificate Information: 4044 N COLLIS AVE 90032

Application / Permit
25016-10000-02111
Plan Check / Job No.
B25LA02708
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING GARAGE WITH 1/2 BATHROOM TO NEW ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(A). WORK DONE PER ENGINEER DESIGN.
Permit Issued
Issued on 5/5/2025
Issuing Office
Current Status
Issued on 5/5/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/27/2025 APPLICANT
Assigned to Plan Check Engineer 1/30/2025 MADISON ODELL
Corrections Issued 1/31/2025 MADISON ODELL
Applicant returned to address corrections 3/19/2025 MADISON ODELL
Plan Check Approved 3/30/2025 MADISON O'DELL
Issued 5/5/2025 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/6/2025 JONATHAN HOM
Address approval Cleared 2/7/2025 PAMELA TENEZA
Sewer availability Cleared 2/8/2025 ABEL CASILLAS
"D" conditions Cleared 3/13/2025 JACQUELINE TORRES
"Q" conditions Cleared 3/13/2025 JACQUELINE TORRES
Eng Process Fee Ord 176,300 Cleared 3/14/2025 PAMELA TENEZA
Hydrant and Access approval Cleared 3/17/2025 KENNETH FRASER

Contact Information

Architect Sheinberg,, Roberto; Lic. No.: C39035 4209 SANTA MONICA BLVD #100      LOS ANGELES, CA 90029
Contractor Gallegos Juan M; Lic. No.: 872177-B       ,
Contractor Juan M Gallegos; Lic. No.: 872177-B       ,
Engineer Baich,, Brendon Chad; Lic. No.: C83347 PO BOX 8840      POMONA, CA 91701

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/7/2025 Partial Inspection LILIANA PORTILLO
Footing/Foundation/Slab 7/14/2025 Approved LILIANA PORTILLO
Underground Mechanical 7/14/2025 Partial Approval LILIANA PORTILLO
ELECTRICAL-Rough 7/24/2025 Approved BRENDAN MORELLI
PLUMBING-Rough 7/24/2025 Corrections Issued BRENDAN MORELLI
BUILDING-Rough-Frame 7/29/2025 Partial Approval ALIZAH MAYAGOITIA
HVAC-Rough 7/29/2025 Approved ALIZAH MAYAGOITIA
PLUMBING-Rough 7/29/2025 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 7/31/2025 Conditional Approval LILIANA PORTILLO
Green Building Rough 7/31/2025 Not Ready for Inspection LILIANA PORTILLO
Insulation 7/31/2025 Partial Approval LILIANA PORTILLO
Drywall Nailing 8/6/2025 Approved LILIANA PORTILLO
Insulation 8/6/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 8/6/2025 Approved LILIANA PORTILLO
Shower Pan 8/6/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 9/5/2025 Approved LILIANA PORTILLO
ELECTRICAL-Final 9/5/2025 Approved LILIANA PORTILLO
Final 9/5/2025 Corrections Issued LILIANA PORTILLO
Green Building Final 9/5/2025 Not Ready for Inspection LILIANA PORTILLO
Green Building Rough 9/5/2025 Approved LILIANA PORTILLO
HVAC-Final 9/5/2025 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Final 9/5/2025 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/5/2025 SGSOV Not Required LILIANA PORTILLO
Smoke Detectors 9/5/2025 Approved LILIANA PORTILLO