1310 S BARRY AVE 90025

Certificate Information: 1310 S BARRY AVE 90025

Application / Permit
25016-10000-01412
Plan Check / Job No.
B25LA01824
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Eplan: Soft-Story seismic retrofit per LABC Chapter 93: (2) SINGLE BAY SPECIAL STEEL MOMENT FRAMES & (2) DOUBLE SIDED PLYWOOD SHEAR WALLS
Permit Issued
Issued on 4/7/2025
Issuing Office
Current Status
CofC Issued on 1/21/2026

Permit Application Status History

Submitted 1/18/2025 APPLICANT
Assigned to Plan Check Engineer 1/23/2025 HANS SANTIAGO
Corrections Issued 1/27/2025 HANS SANTIAGO
Quality Review Completed 1/30/2025 CHARLES CHANG
Plan Check Approved 2/26/2025 ANDREW SANTIAGO
Issued 4/7/2025 APPLICANT
OK for CofC 1/12/2026 RICARDO ROBLES
CofC Issued 1/21/2026 DAVID TSAU

Permit Application Clearance Information

Tenant Habitability Plan Cleared 4/7/2025 KORNEL LELEA

Contact Information

Contractor One Stop Retrofit; Lic. No.: 1026051-B       ,
Engineer Alexander,, Andy; Lic. No.: NA84086       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/22/2025 Approved RICARDO ROBLES
Deputy Steel/Welding 10/10/2025 Partial Approval VASIL MIHALEV
Deputy Drilled-In Anchors 10/16/2025 Approved DAVID TSAU
Deputy Wood Construction 10/16/2025 Approved DAVID TSAU
Excavation/Setback/Form/Re-Bar 10/16/2025 Approved DAVID TSAU
Footing/Foundation/Slab 10/16/2025 Partial Approval DAVID TSAU
Structural Steel Frame 10/16/2025 Not Ready for Inspection DAVID TSAU
Wood Frame 10/16/2025 Not Ready for Inspection DAVID TSAU
Deputy Reinf. Concrete 10/22/2025 Conditional Approval RICARDO ROBLES
Deputy Steel/Welding 11/10/2025 Conditional Approval RICARDO ROBLES
Floor/Roof Diaphrgm/Shear Wall 11/25/2025 Not Ready for Inspection DANIEL VARNUM
Insulation 11/25/2025 Not Ready for Inspection DANIEL VARNUM
Wood Frame 11/25/2025 Corrections Issued DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 12/1/2025 Approved RICARDO ROBLES
Insulation 12/1/2025 Approved RICARDO ROBLES
Structural Steel Frame 12/1/2025 Approved RICARDO ROBLES
Wood Frame 12/1/2025 Approved RICARDO ROBLES
Drywall Nailing 12/8/2025 Approved RICARDO ROBLES
Structural Steel Frame 12/8/2025 Approved RICARDO ROBLES
Wood Frame 12/8/2025 Approved RICARDO ROBLES
Interior/Exterior Lathing 12/16/2025 Approved RICARDO ROBLES
Final 1/12/2026 OK for CofC RICARDO ROBLES
SGSOV-Seismic Gas S/O Valve 1/12/2026 SGSOV Approved RICARDO ROBLES
Smoke Detectors 1/12/2026 Approved RICARDO ROBLES