2326 3/4 S PENMAR AVE 90291

Certificate Information: 2326 3/4 S PENMAR AVE 90291

Application / Permit
25016-10000-01244
Plan Check / Job No.
B25LA01595
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED 18'-3"X16'-2" GARAGE AND 8'-8"X1'-10" UNPERMITTED PORTION BUILT PRIOR TO JAN 1, 2018 PER GCS 65852.23 TO ACCESSORY DWELLING UNIT PER STATE LAW (GCS 66323(a)(1)) AND IB P/BC 2023-150. Existing construction that does not pose a threat to the publics health and safety was allowed per Government Code Section 55.852.2(d)(2).
Permit Issued
Issued on 4/3/2025
Issuing Office
Valley
Current Status
Issued on 4/3/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/16/2025 APPLICANT
Assigned to Plan Check Engineer 1/23/2025 LAWRENCE QUIRANTE
Corrections Issued 1/25/2025 LAWRENCE QUIRANTE
Building Plans Picked Up 1/27/2025 APPLICANT
Applicant returned to address corrections 3/14/2025 DAVID CASTILLO
Issued 4/3/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 1/29/2025 HISASHI KOBAYAKAWA
Sewer availability Cleared 1/29/2025 RYAN CASTRO
Eng Process Fee Ord 176,300 Cleared 1/30/2025 RYAN CASTRO
Specific Plan Cleared 2/4/2025 FREDDY GARCIA
"Q" conditions Cleared 2/7/2025 ALEX VELA

Contact Information

Contractor Owner-Builder       ,
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 2999 OVERLAND AVE STE 103      LOS ANGELES, CA 90064

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 7/18/2025 Corrections Issued JESUS RODRIGUEZ
Footing/Foundation/Slab 7/29/2025 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/6/2025 Partial Approval MICHAEL ALLEN
Green Building Final 8/6/2025 Not Ready for Inspection MICHAEL ALLEN
Green Building Rough 8/6/2025 Not Ready for Inspection MICHAEL ALLEN
SGSOV-Seismic Gas S/O Valve 8/6/2025 SGSOV Not Ready MICHAEL ALLEN
Smoke Detectors 8/6/2025 Approved MICHAEL ALLEN
Special/Order Compliance 8/6/2025 Corrections Issued MICHAEL ALLEN
Pre-Inspection 8/13/2025 Not Ready for Inspection JESUS RODRIGUEZ
Special/Order Compliance 8/13/2025 Partial Inspection DAVID FEILER
Special/Order Compliance 8/13/2025 Partial Inspection JAYLIN GRAVITTE
Pre-Inspection 12/4/2025 Corrections Issued RUBEN RIVAS
PLUMBING-Rough 12/10/2025 Corrections Issued RUBEN RIVAS
PLUMBING-Rough 12/11/2025 Partial Approval RUBEN RIVAS
Insulation 12/17/2025 Approved RUBEN RIVAS
Interior/Exterior Lathing 12/17/2025 Partial Approval RUBEN RIVAS
SGSOV-Seismic Gas S/O Valve 12/18/2025 SGSOV Not Ready RUBEN RIVAS
ELECTRICAL-Rough 1/15/2026 Not Ready for Inspection RUBEN RIVAS
ELECTRICAL-Final 3/24/2026 Corrections Issued RUBEN RIVAS
ELECTRICAL-Final 4/14/2026 Corrections Issued RUBEN RIVAS
BUILDING-Rough-Frame 7/2/2026 Approved RUBEN RIVAS
Final 7/2/2026 Partial Approval RUBEN RIVAS
Green Building Final 7/2/2026 Approved RUBEN RIVAS
Green Building Rough 7/2/2026 Approved RUBEN RIVAS
PLUMBING-Final 7/2/2026 Approved RUBEN RIVAS
SGSOV-Seismic Gas S/O Valve 7/2/2026 SGSOV Approved RUBEN RIVAS
Final 7/14/2026 Corrections Issued RUBEN RIVAS