1576 N DOHENY DR 90069

Certificate Information: 1576 N DOHENY DR 90069

Application / Permit
25016-10000-00517
Plan Check / Job No.
B25LA00581
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
STRUCTURAL REMODEL TO EXISTING SINGLE FAMILY DWELLING WITH ATTACHED GARAGE. WORK INCLUDES NEW WINDOWS, SKYLIGHTS, KITCHEN AND BATHROOM REMODEL AND NEW POWDER ROOM.
Permit Issued
Issued on 2/13/2025
Issuing Office
Metro
Current Status
Permit Finaled on 11/12/2025

Permit Application Status History

Submitted 1/8/2025 APPLICANT
Assigned to Plan Check Engineer 1/14/2025 SAMUEL GONZALEZ
Corrections Issued 1/14/2025 SAMUEL GONZALEZ
Applicant returned to address corrections 1/29/2025 LUKE GONZALES
Plan Check Approved 2/5/2025 ADAM HEGAZI
Issued 2/13/2025 APPLICANT
Permit Finaled 11/12/2025 BRENDAN MORELLI

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Red Stag Construction Company; Lic. No.: 964664-B 3211 CAHUENGA BLVD WEST #207      LOS ANGELES, CA 90068
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21731 VENTURA BLVD SUITE 110      WOODLAND HILLS, CA 91364

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 2/18/2025 Approved ROY SPAULDING
HVAC-Rough 2/18/2025 Approved ROY SPAULDING
PLUMBING-Rough 2/18/2025 Approved ROY SPAULDING
Deputy Drilled-In Anchors 2/19/2025 Conditional Approval ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 3/3/2025 Not Ready for Inspection RAUL BARAJAS
Masonry Wall/Backfill 3/3/2025 Not Ready for Inspection RAUL BARAJAS
Insulation 3/21/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 3/21/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 3/26/2025 Approved ALEX COLIN
Shower Pan 3/26/2025 Approved ALEX COLIN
Drywall Nailing 4/3/2025 Approved ROY SPAULDING
Final 10/15/2025 No Access for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 10/15/2025 SGSOV Not Ready ROY SPAULDING
Smoke Detectors 10/15/2025 No Access for Inspection ROY SPAULDING
Final 10/17/2025 Corrections Issued CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 10/17/2025 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 10/17/2025 Approved CRAIG VAUGHAN
Final 11/12/2025 Permit Finaled BRENDAN MORELLI