1514-1516 E YOUNG ST 90744

Certificate Information: 1514-1516 E YOUNG ST 90744

Application / Permit
25014-70000-02456
Plan Check / Job No.
B25SL00572
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Alteration to single family dwelling to convert portion of dwelling into JADU (390sf). Convert attached garage will small addition to ADU (454sf) per state law. Minor remodel of existing sfd at kitchen and bathroom areas. Create additional third bedroom to existing two bedroom dwelling.
Permit Issued
Issued on 7/1/2025
Issuing Office
South Los Angeles
Current Status
CofO Issued on 4/7/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/29/2025 APPLICANT
Assigned to Plan Check Engineer 6/3/2025 RICARDO RAMIREZ
Corrections Issued 6/3/2025 RICARDO RAMIREZ
Applicant returned to address corrections 6/24/2025 LUKE GONZALES
Issued 7/1/2025 APPLICANT
CofO in Progress 4/7/2026 JOSEPH MCGARRY
Permit Finaled 4/7/2026 ANSON MAGLASANG
CofO Issued 4/7/2026 ANSON MAGLASANG
Permit Finaled 4/7/2026 ANSON MAGLASANG

Permit Application Clearance Information

Address approval Cleared 6/5/2025 BIAINA HARITUNIAN
Eng Process Fee Ord 176,300 Cleared 6/6/2025 BIAINA HARITUNIAN
Sewer availability Cleared 6/6/2025 BIAINA HARITUNIAN
Roof/Waste drainage to street Cleared 6/24/2025 DAVID LOPEZ

Contact Information

Contractor Baumeister Construction; Lic. No.: 1107111-B 1379 W PARK WESTERN DR STE 608      SAN PEDRO, CA 90732

Inspector Information

EUGENE CASSIDY, (310) 548-2508 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/17/2025 Corrections Issued BEN MOLSTAD
METHANE-Barrier 7/17/2025 Not Ready for Inspection BEN MOLSTAD
METHANE-Subgrade 7/17/2025 Not Ready for Inspection BEN MOLSTAD
Footing/Foundation/Slab 9/15/2025 Corrections Issued EUGENE CASSIDY
METHANE-Barrier 9/15/2025 No Access for Inspection EUGENE CASSIDY
METHANE-Subgrade 9/15/2025 No Access for Inspection EUGENE CASSIDY
Footing/Foundation/Slab 10/10/2025 Corrections Issued EUGENE CASSIDY
METHANE-Barrier 10/10/2025 Approved EUGENE CASSIDY
METHANE-Subgrade 10/10/2025 Approved EUGENE CASSIDY
PLUMBING-Rough 10/10/2025 Partial Approval EUGENE CASSIDY
Footing/Foundation/Slab 10/15/2025 Corrections Issued EUGENE CASSIDY
Excavation/Setback/Form/Re-Bar 10/16/2025 Approved EUGENE CASSIDY
ELECTRICAL-Rough 11/4/2025 Corrections Issued EUGENE CASSIDY
BUILDING-Rough-Frame 11/12/2025 Partial Approval JOSEPH MCGARRY
ELECTRICAL-Rough 11/12/2025 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 11/12/2025 Conditional Approval JOSEPH MCGARRY
HVAC-Rough 11/12/2025 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 11/12/2025 Partial Approval JOSEPH MCGARRY
Sewer 11/12/2025 Approved JOSEPH MCGARRY
Shower Pan 11/12/2025 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 11/26/2025 Corrections Issued JOSEPH MCGARRY
ELECTRICAL-Rough 11/26/2025 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 11/26/2025 Approved JOSEPH MCGARRY
Insulation 11/26/2025 Not Ready for Inspection JOSEPH MCGARRY
Interior/Exterior Lathing 11/26/2025 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 12/3/2025 Approved EUGENE CASSIDY
Green Building Rough 12/3/2025 Approved EUGENE CASSIDY
HVAC-Rough 12/3/2025 Approved EUGENE CASSIDY
Insulation 12/3/2025 Partial Approval EUGENE CASSIDY
METHANE-Rough 12/3/2025 Approved EUGENE CASSIDY
PLUMBING-Rough 12/3/2025 Approved EUGENE CASSIDY
Drywall Nailing 12/5/2025 Partial Approval JOSEPH MCGARRY
Drywall Nailing 12/15/2025 Approved EUGENE CASSIDY
Interior/Exterior Lathing 12/15/2025 Approved EUGENE CASSIDY
Drywall Nailing 12/16/2025 Approved EUGENE CASSIDY
Interior/Exterior Lathing 12/16/2025 Approved EUGENE CASSIDY
ELECTRICAL-Final 2/23/2026 Corrections Issued EUGENE CASSIDY
Final 3/20/2026 Corrections Issued JOSEPH MCGARRY
Footing/Foundation/Slab 3/20/2026 Approved JOSEPH MCGARRY
Green Building Final 3/20/2026 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 3/20/2026 SGSOV Not Ready JOSEPH MCGARRY
Smoke Detectors 3/20/2026 Approved JOSEPH MCGARRY
ELECTRICAL-Final 3/25/2026 Corrections Issued BEN MOLSTAD
Final 3/25/2026 Corrections Issued BEN MOLSTAD
HVAC-Final 3/25/2026 Approved BEN MOLSTAD
SGSOV-Seismic Gas S/O Valve 3/25/2026 SGSOV Not Ready BEN MOLSTAD
ELECTRICAL-Final 3/27/2026 Approved JOSEPH MCGARRY
Final 3/27/2026 OK to Issue CofO JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 3/27/2026 SGSOV Approved JOSEPH MCGARRY