324 S DALKEITH AVE 90049

Certificate Information: 324 S DALKEITH AVE 90049

Application / Permit
25014-30000-02787
Plan Check / Job No.
B25WL05026
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
78.6 sf kitchen addition (12' 9" x 6' 4") at first floor (e) porch below existing balcony above (n) 21 RFA, (R) 21 sf (7' 6" x 2' 9") at second floor to be replaced with new solid balcony, kitchen remodel, replace windows/doors
Permit Issued
Issued on 9/19/2025
Issuing Office
West Los Angeles
Current Status
Issued on 9/19/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/17/2025 APPLICANT
Assigned to Plan Check Engineer 6/20/2025 KAVIAN REFAHI
Corrections Issued 6/23/2025 KAVIAN REFAHI
Building Plans Picked Up 6/24/2025 APPLICANT
Plan Check Approved 7/9/2025 AMY GUEVARRA
Issued 9/19/2025 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 6/23/2025 LANNY MERRICK

Contact Information

Architect Peteris,, Gidas Viktor; Lic. No.: C24006 1440 VETERAN AVENUE #205      LOS ANGELES, CA 90024
Contractor Scalise Louis; Lic. No.: 978532-B P O BOX 2110      PASADENA, CA 91102
Engineer Mercado,, Lizandro; Lic. No.: S4331 27240 TURNBERRY LN STE 200      VALENCIA, CA 91355

Inspector Information

EVAN COOPER, (310) 914-3861 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/25/2025 Approved CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 11/14/2025 Approved CARLOS MATAMOROS
Footing/Foundation/Slab 11/14/2025 Approved CARLOS MATAMOROS
Deputy Steel/Welding 11/25/2025 Conditional Approval ANDREW NAVE
PLUMBING-Rough 2/5/2026 Approved CARLOS MATAMOROS
HVAC-Rough 2/18/2026 Partial Approval EVAN COOPER
Gas Test 3/10/2026 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/13/2026 Approved EVAN COOPER
BUILDING-Rough-Frame 3/20/2026 Conditional Approval EVAN COOPER
Green Building Rough 3/20/2026 Not Ready for Inspection EVAN COOPER
MERV13>=Rough 3/20/2026 Approved EVAN COOPER
Interior/Exterior Lathing 4/7/2026 Partial Approval CHRISTOPHER WILSON
Insulation 4/14/2026 Approved EVAN COOPER
Drywall Nailing 5/12/2026 Approved RYAN SALAZAR
Shower Pan 5/12/2026 Not Ready for Inspection RYAN SALAZAR
Shower Pan 5/27/2026 Approved CARLOS MATAMOROS
Shower Pan 5/28/2026 Approved EVAN COOPER