9123 S CIMARRON ST 90047

Certificate Information: 9123 S CIMARRON ST 90047

Application / Permit
25014-20000-04351
Plan Check / Job No.
B25VN28414
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ADDITION TO AND CONVER (E) GARAGE TO ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(b)(1),(c),(d),(h) and (k)
Permit Issued
Issued on 12/3/2025
Issuing Office
Current Status
Issued on 12/3/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/26/2025 APPLICANT
Assigned to Plan Check Engineer 10/3/2025 JESSE ARELLANO
Corrections Issued 10/4/2025 JESSE ARELLANO
Building Plans Picked Up 10/9/2025 APPLICANT
Plan Check Approved 12/3/2025 YAQUB MIRZA
Issued 12/3/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 10/9/2025 BIAINA HARITUNIAN
Eng Process Fee Ord 176,300 Cleared 10/10/2025 BIAINA HARITUNIAN
Sewer availability Cleared 10/10/2025 BIAINA HARITUNIAN
Roof/Waste drainage to street Cleared 11/4/2025 BIAINA HARITUNIAN
Construction near power lines Cleared 11/26/2025 RIDWAN HARDY
Construction within easement Cleared 11/26/2025 RIDWAN HARDY

Contact Information

Contractor Soul Builders Inc; Lic. No.: 1103425-B 18163 ARMINTA ST      RESEDA, CA 91335
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21731 VENTURA BLVD SUITE 110      WOODLAND HILLS, CA 91364

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Final 6/8/2026   
BUILDING-Rough-Frame 6/8/2026   
Smoke Detectors 6/8/2026   
SGSOV-Seismic Gas S/O Valve 6/8/2026   
Green Building Final 6/8/2026   

Inspection Request History

Underground Mechanical 12/18/2025 Corrections Issued SALVADOR MARTINEZ
Footing/Foundation/Slab 12/22/2025 Not Ready for Inspection MICHAEL LEWIS
METHANE-Barrier 12/22/2025 Not Ready for Inspection MICHAEL LEWIS
METHANE-Subgrade 12/22/2025 Not Ready for Inspection MICHAEL LEWIS
PLUMBING-Rough 12/22/2025 Partial Approval MICHAEL LEWIS
Sewer 12/22/2025 Approved MICHAEL LEWIS
Underground Mechanical 12/22/2025 Approved MICHAEL LEWIS
Underground Mechanical 1/22/2026 Partial Inspection SALVADOR MARTINEZ
Pre-Inspection 1/27/2026 Approved MICHAEL LEWIS
Deputy Drilled-In Anchors 2/3/2026 Conditional Approval MICHAEL LEWIS
Footing/Foundation/Slab 2/4/2026 Corrections Issued SALVADOR MARTINEZ
METHANE-Barrier 2/4/2026 Approved SALVADOR MARTINEZ
METHANE-Subgrade 2/4/2026 Approved SALVADOR MARTINEZ
Footing/Foundation/Slab 2/9/2026 Approved SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 3/9/2026 Partial Inspection SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 3/11/2026 Partial Approval SALVADOR MARTINEZ
ELECTRICAL-Rough 3/16/2026 Corrections Issued SALVADOR MARTINEZ
PLUMBING-Rough 3/16/2026 Corrections Issued SALVADOR MARTINEZ
ELECTRICAL-Rough 3/20/2026 Corrections Issued SALVADOR MARTINEZ
HVAC-Rough 3/20/2026 Corrections Issued SALVADOR MARTINEZ
PLUMBING-Rough 3/20/2026 Approved SALVADOR MARTINEZ
ELECTRICAL-Rough 3/23/2026 Approved SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 3/23/2026 Approved SALVADOR MARTINEZ
HVAC-Rough 3/23/2026 Approved SALVADOR MARTINEZ
Interior/Exterior Lathing 3/27/2026 Corrections Issued SALVADOR MARTINEZ
BUILDING-Rough-Frame 3/31/2026 Corrections Issued MICHAEL LEWIS
Green Building Rough 3/31/2026 Approved MICHAEL LEWIS
Interior/Exterior Lathing 3/31/2026 Approved MICHAEL LEWIS
METHANE-Rough 3/31/2026 Approved MICHAEL LEWIS
Insulation 4/3/2026 Corrections Issued ALEX COLIN
Drywall Nailing 4/7/2026 Approved SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 4/7/2026 Approved SALVADOR MARTINEZ
Interior/Exterior Lathing 4/13/2026 Partial Approval STUART CHAPMAN
Shower Pan 4/13/2026 Approved STUART CHAPMAN
Gas Test 5/21/2026 Approved SALVADOR MARTINEZ