Work Description
REMOVE ALL THE INTERIOR AND EXTERIOR WALLS OF AN EXISTING ONE STORY DWELLING EXCEPT 1 LF OF WALL AND FOUNDATION AT WEST PORTION OF THE LOT AND BUILD DUPLEX PER SB9 WITH ATTACHED ACCESSORY DWELLING UNIT AS PER LAMC 12.22 A.33 (c) and (e) AND ATTACHED TWO CAR GARAGE, NFPA-13D FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 12/16/2025
Issuing Office
Current Status
Issued on 12/16/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/25/2025 APPLICANT
Assigned to Plan Check Engineer 8/7/2025 RARES BODEA
Corrections Issued 8/14/2025 RARES BODEA
Quality Review Completed 8/21/2025 STEVEN KIM
Building Plans Picked Up 8/22/2025 APPLICANT
Applicant returned to address corrections 11/12/2025 RARES BODEA
Applicant returned to address corrections 11/24/2025 RARES BODEA
Plan Check Approved 11/24/2025 RARES BODEA
Issued 12/16/2025 APPLICANT

Permit Application Clearance Information

Low Impact Development (LID) Cleared 8/19/2025 ERNEST TSE
Address approval Cleared 8/22/2025 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 8/22/2025 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 8/22/2025 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 8/28/2025 LEE GUILBEAUX
Sewer availability Cleared 8/28/2025 LEE GUILBEAUX
Senate Bill 9 Cleared 9/11/2025 MAYELA VILLA

Contact Information

Contractor Owner-Builder       ,
Engineer Grigoryan,, Souren; Lic. No.: C93320 6506 TEESDALE AVE      NORTH HOLLYWOOD, CA 91606

Inspector Information

ARUTYUN MADATYAN, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI
JUAN ALVARADO, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Interior/Exterior Lathing 8/12/2026   

Inspection Request History

Pre-Inspection 12/29/2025 Corrections Issued JUAN ALVARADO
Pre-Inspection 1/6/2026 Partial Inspection ARUTYUN MADATYAN
Underground Mechanical 2/27/2026 Approved JUAN ALVARADO
Deputy Drilled-In Anchors 3/5/2026 Conditional Approval ROBERT GOLD
Excavation/Setback/Form/Re-Bar 3/6/2026 Partial Approval ROBERT GOLD
Footing/Foundation/Slab 3/6/2026 Corrections Issued ROBERT GOLD
Excavation/Setback/Form/Re-Bar 3/10/2026 Approved JUAN ALVARADO
Footing/Foundation/Slab 3/10/2026 Partial Approval JUAN ALVARADO
Deputy Wood Construction 4/7/2026 Conditional Approval ARUTYUN MADATYAN
Floor/Roof Diaphrgm/Shear Wall 4/8/2026 Partial Approval JUAN ALVARADO
Deputy Wood Construction 5/7/2026 Conditional Approval ROBERT GOLD
Floor/Roof Diaphrgm/Shear Wall 5/8/2026 Conditional Approval JUAN ALVARADO
Floor/Roof Diaphrgm/Shear Wall 5/15/2026 Partial Approval ARUTYUN MADATYAN
HVAC-Rough 6/5/2026 Not Ready for Inspection JUAN ALVARADO
Interior/Exterior Lathing 6/5/2026 Approved JUAN ALVARADO
PLUMBING-Rough 6/5/2026 Corrections Issued JUAN ALVARADO
HVAC-Rough 6/9/2026 Approved JUAN ALVARADO
PLUMBING-Rough 6/9/2026 Approved JUAN ALVARADO
ELECTRICAL-Rough 6/15/2026 Approved JUAN ALVARADO
BUILDING-Rough-Frame 6/18/2026 Not Ready for Inspection JUAN ALVARADO
Green Building Rough 6/18/2026 Approved JUAN ALVARADO
Wood Frame 6/18/2026 Not Ready for Inspection JUAN ALVARADO
BUILDING-Rough-Frame 7/8/2026 Approved JUAN ALVARADO
Verify Sprinkler Sign Off 7/8/2026 Approved JUAN ALVARADO
Wood Frame 7/8/2026 Approved JUAN ALVARADO
Insulation 7/10/2026 Conditional Approval JUAN ALVARADO
Drywall Nailing 7/16/2026 Approved JUAN ALVARADO
Drywall Nailing 7/17/2026 Approved JUAN ALVARADO
Shower Pan 7/17/2026 Approved JUAN ALVARADO