649 N STANLEY AVE 90036
Certificate Information: 649 N STANLEY AVE 90036
- Application / Permit
- 25014-20000-03173
- Plan Check / Job No.
- B25VN19993
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Accessory Dwelling Unit
- Work Description
- CONVERT EXISTING DETACHED GARAGE INTO ACCESSORY DWELLING UNIT WITH ADDITION PER GCS 66323(a)(2). ALL NEW ROOF FRAMING. CONSTR DESIGN PER ENGR.
- Permit Issued
- Issued on 10/9/2025
- Issuing Office
- Valley
- Current Status
- CofO Issued on 5/21/2026
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 7/14/2025 | APPLICANT |
| Assigned to Plan Check Engineer | 7/18/2025 | HAYATO TSUCHIYA |
| Corrections Issued | 7/19/2025 | HAYATO TSUCHIYA |
| Building Plans Picked Up | 7/22/2025 | APPLICANT |
| Plan Check Approved | 10/9/2025 | YAQUB MIRZA |
| Issued | 10/9/2025 | APPLICANT |
| CofO in Progress | 5/14/2026 | JOSH MEISTER |
| No Progress | 5/15/2026 | CHARLES BOGHOSKHAN |
| CofO in Progress | 5/15/2026 | CHARLES BOGHOSKHAN |
| CofO Issued | 5/21/2026 | DEROLD HAUFF |
| Permit Finaled | 5/21/2026 | DEROLD HAUFF |
Permit Application Clearance Information
| Construction near power lines | Cleared | 9/22/2025 | RIDWAN HARDY |
| Address approval | Cleared | 10/8/2025 | WALLIE JONG |
| Eng Process Fee Ord 176,300 | Cleared | 10/8/2025 | WALLIE JONG |
| Roof/Waste drainage to street | Cleared | 10/8/2025 | WALLIE JONG |
| Sewer availability | Cleared | 10/8/2025 | WALLIE JONG |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Mobed,, Ashkan; Lic. No.: C92493 | 23450 KITTREDGE ST WEST HILLS, CA 91307 |
Inspector Information
| JOSE MACIAS, (213) 202-3125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 11/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| METHANE-Barrier | 11/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| METHANE-Subgrade | 11/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| Excavation/Setback/Form/Re-Bar | 11/4/2025 | Corrections Issued | JOSH MEISTER |
| METHANE-Rough | 11/4/2025 | Approved | JOSH MEISTER |
| Excavation/Setback/Form/Re-Bar | 11/7/2025 | Approved | ENRIQUE MIRELES |
| Footing/Foundation/Slab | 11/7/2025 | Approved | ENRIQUE MIRELES |
| METHANE-Barrier | 11/7/2025 | Approved | ENRIQUE MIRELES |
| METHANE-Subgrade | 11/7/2025 | Approved | ENRIQUE MIRELES |
| Pre-Inspection | 11/7/2025 | Approved | ENRIQUE MIRELES |
| Reinforced Concrete Frame | 12/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| Reinforced Masonry Frame | 12/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| Structural Steel Frame | 12/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| Wood Frame | 12/3/2025 | Not Ready for Inspection | JOSH MEISTER |
| BUILDING-Rough-Frame | 12/9/2025 | Not Ready for Inspection | JOSH MEISTER |
| Green Building Rough | 12/9/2025 | Not Ready for Inspection | JOSH MEISTER |
| Reinforced Concrete Frame | 12/9/2025 | Not Ready for Inspection | JOSH MEISTER |
| Reinforced Masonry Frame | 12/9/2025 | Not Ready for Inspection | JOSH MEISTER |
| Wood Frame | 12/9/2025 | Not Ready for Inspection | JOSH MEISTER |
| ELECTRICAL-Rough | 12/12/2025 | Approved | ENRIQUE MIRELES |
| PLUMBING-Rough | 12/12/2025 | Approved | ENRIQUE MIRELES |
| Sewer | 12/12/2025 | Approved | ENRIQUE MIRELES |
| ELECTRICAL-Rough | 12/16/2025 | Approved | JOSH MEISTER |
| HVAC-Rough | 12/22/2025 | Corrections Issued | JOSH MEISTER |
| HVAC-Rough | 12/29/2025 | Approved | RONNIE MINDANAO |
| PLUMBING-Rough | 12/29/2025 | Approved | RONNIE MINDANAO |
| BUILDING-Rough-Frame | 12/31/2025 | Not Ready for Inspection | JOSH MEISTER |
| Floor/Roof Diaphrgm/Shear Wall | 12/31/2025 | Conditional Approval | JOSH MEISTER |
| Green Building Rough | 12/31/2025 | Not Ready for Inspection | JOSH MEISTER |
| BUILDING-Rough-Frame | 1/9/2026 | Approved | JOSH MEISTER |
| Green Building Rough | 1/9/2026 | Approved | JOSH MEISTER |
| Interior/Exterior Lathing | 1/9/2026 | Partial Approval | JOSH MEISTER |
| Insulation | 1/13/2026 | Approved | ENRIQUE MIRELES |
| Shower Pan | 1/15/2026 | Approved | JOSH MEISTER |
| Drywall Nailing | 1/20/2026 | Approved | JOSH MEISTER |
| Interior/Exterior Lathing | 1/20/2026 | Approved | JOSH MEISTER |
| Drywall Nailing | 1/21/2026 | Approved | JOSH MEISTER |
| HVAC-Final | 2/25/2026 | Corrections Issued | JOSH MEISTER |
| ELECTRICAL-Final | 4/30/2026 | Approved | JOSH MEISTER |
| Final | 4/30/2026 | Corrections Issued | JOSH MEISTER |
| Gas Test | 4/30/2026 | Corrections Issued | JOSH MEISTER |
| Green Building Final | 4/30/2026 | Corrections Issued | JOSH MEISTER |
| HVAC-Final | 4/30/2026 | Approved | JOSH MEISTER |
| PLUMBING-Final | 4/30/2026 | Approved | JOSH MEISTER |
| SGSOV-Seismic Gas S/O Valve | 4/30/2026 | SGSOV Approved | JOSH MEISTER |
| Service/Power Release | 4/30/2026 | Not Ready for Inspection | JOSH MEISTER |
| Smoke Detectors | 4/30/2026 | Approved | JOSH MEISTER |
| Final | 5/4/2026 | Not Ready for Inspection | JOSH MEISTER |
| Gas Test | 5/4/2026 | Approved | JOSH MEISTER |
| Green Building Final | 5/4/2026 | Not Ready for Inspection | JOSH MEISTER |
| PLUMBING-Final | 5/4/2026 | Approved | JOSH MEISTER |
| Final | 5/6/2026 | Not Ready for Inspection | JOSH MEISTER |
| Green Building Final | 5/6/2026 | Not Ready for Inspection | JOSH MEISTER |
| Final | 5/11/2026 | OK to Issue CofO | JOSH MEISTER |
| Green Building Final | 5/11/2026 | Approved | JOSH MEISTER |