12648 W CALIFA ST 91607

Certificate Information: 12648 W CALIFA ST 91607

Application / Permit
25014-20000-01674
Plan Check / Job No.
B25VN10538
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT 18'-6" X 19'-10" ATTACHED GARAGE TO SFD. PROPOSED 18' X 20'-10" GARAGE ADDITION AND 6'-4" X 6'-5" AT FRONT AND 10'-1" X 21'-1" AT REAR AND REMODEL TO (E) SFD. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/21/2025
Issuing Office
Current Status
Issued on 7/21/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/16/2025 APPLICANT
Assigned to Plan Check Engineer 4/24/2025 RAPHAEL ROSAS
Corrections Issued 4/28/2025 RAPHAEL ROSAS
Quality Review Completed 4/28/2025 STEVEN KIM
Building Plans Picked Up 4/28/2025 APPLICANT
Applicant returned to address corrections 7/16/2025 RAPHAEL ROSAS
Plan Check Approved 7/21/2025 RAPHAEL ROSAS
Issued 7/21/2025 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/30/2025 MICHAEL BROWN
Sewer availability Cleared 4/30/2025 MICHAEL BROWN
Roof/Waste drainage to street Cleared 7/17/2025 RYAN CASTRO

Contact Information

Contractor Owner-Builder       ,
Engineer Shmeit,, Ayman Ivan; Lic. No.: C93325 16905 ARMDORE AVE      BELLFLOWER, CA 90706

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/7/2025 Conditional Approval JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 8/14/2025 Not Ready for Inspection GAREN HAYRAPETYAN
Footing/Foundation/Slab 8/14/2025 Corrections Issued GAREN HAYRAPETYAN
Excavation/Setback/Form/Re-Bar 8/19/2025 Approved OGANES TARAKHCHYAN
Footing/Foundation/Slab 8/19/2025 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 9/3/2025 Partial Approval OGANES TARAKHCHYAN
Insulation 9/8/2025 Partial Approval JACK KARGODORIAN
Floor/Roof Diaphrgm/Shear Wall 10/3/2025 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 10/27/2025 Not Ready for Inspection WAYNE REGESTER
ELECTRICAL-Rough 10/27/2025 Approved WAYNE REGESTER
Green Building Rough 10/27/2025 Not Ready for Inspection WAYNE REGESTER
PLUMBING-Rough 10/27/2025 Approved WAYNE REGESTER
BUILDING-Rough-Frame 11/3/2025 Not Ready for Inspection WAYNE REGESTER
Green Building Rough 11/3/2025 Not Ready for Inspection WAYNE REGESTER
BUILDING-Rough-Frame 12/5/2025 Approved WAYNE REGESTER
Green Building Rough 12/5/2025 Approved WAYNE REGESTER
Interior/Exterior Lathing 12/15/2025 Partial Approval LOUIS ESCOTO
Shower Pan 12/15/2025 Approved LOUIS ESCOTO
Insulation 12/22/2025 Conditional Approval MICHAEL CORTEZ
HVAC-Rough 12/24/2025 Approved WAYNE REGESTER
Drywall Nailing 12/31/2025 Corrections Issued JAVIER RAMOS JR
Interior/Exterior Lathing 12/31/2025 Not Ready for Inspection JAVIER RAMOS JR
Pre-Inspection 12/31/2025 Partial Approval JAVIER RAMOS JR
Interior/Exterior Lathing 1/6/2026 Approved WAYNE REGESTER
Drywall Nailing 4/7/2026 Not Ready for Inspection WAYNE REGESTER
Final 4/7/2026 Not Ready for Inspection WAYNE REGESTER
Green Building Final 4/7/2026 Approved WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 4/7/2026 SGSOV Not Ready WAYNE REGESTER
Smoke Detectors 4/7/2026 Not Ready for Inspection WAYNE REGESTER
Drywall Nailing 4/23/2026 Approved WAYNE REGESTER
ELECTRICAL-Final 4/23/2026 Approved WAYNE REGESTER
Final 4/23/2026 Not Ready for Inspection WAYNE REGESTER
HVAC-Final 4/23/2026 Approved WAYNE REGESTER
PLUMBING-Final 4/23/2026 Approved WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 4/23/2026 SGSOV Approved WAYNE REGESTER
Smoke Detectors 4/23/2026 Approved WAYNE REGESTER