315 N BEVERLY GLEN BLVD 90077

Certificate Information: 315 N BEVERLY GLEN BLVD 90077

Application / Permit
25014-20000-01325
Plan Check / Job No.
B25VN08137
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
46'-1" X 32'-3" IRREGULAR SHAPEED ADDITION WITH 14'-4" X 6'-6" AND 19'-11" X 6'-3" ADDITIONS AND REMODEL TO THE EXISTING SINGLE FAMILY WITH ATTACHED GARAGE - PER ENGINEER
Permit Issued
Issued on 5/14/2025
Issuing Office
Metro
Current Status
Issued on 5/14/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/25/2025 APPLICANT
Assigned to Plan Check Engineer 3/27/2025 DANIEL ABRAMYAN
Corrections Issued 4/2/2025 DANIEL ABRAMYAN
Quality Review Completed 4/12/2025 DAWN MC NULTY
Building Plans Picked Up 4/16/2025 APPLICANT
Applicant returned to address corrections 4/23/2025 DANIEL ABRAMYAN
Plan Check Approved 5/13/2025 DANIEL ABRAMYAN
Issued 5/14/2025 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 4/5/2025 DARIN LAM
BHO/Hillside ordinance Cleared 4/5/2025 DARIN LAM
BHO/Hillside ordinance Cleared 4/5/2025 DARIN LAM
BHO/Hillside ordinance Cleared 4/5/2025 DARIN LAM
BHO/Hillside ordinance Cleared 4/5/2025 DARIN LAM
Eng Process Fee Ord 176,300 Cleared 4/9/2025 DARIN LAM
Sewer availability Cleared 4/9/2025 DARIN LAM
Hydrant and Access approval Cleared 4/10/2025 JOHN CONNEALLY
GPI Written Notices Cleared 4/23/2025 DANIEL ABRAMYAN
Grading Pre-Inspection Cleared 4/23/2025 DANIEL ABRAMYAN
Roof/Waste drainage to street Cleared 4/24/2025 BIAINA HARITUNIAN

Contact Information

Contractor Utopia Development Inc; Lic. No.: 710612-B 2371 E 51ST STREET      VERNON, CA 90058
Engineer Khatchadourian,, Vicken; Lic. No.: S3141 1221 N CEDAR ST      GLENDALE, CA 92107

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/16/2025 Partial Approval SEAN HAUPT
BUILDING-Rough-Frame 5/23/2025 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 5/23/2025 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 6/5/2025 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/5/2025 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/10/2025 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 6/10/2025 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/11/2025 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/13/2025 Partial Approval SEAN HAUPT
Gas Test 6/17/2025 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/17/2025 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/30/2025 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 7/9/2025 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 7/23/2025 Approved SEAN HAUPT
Pre-Inspection 7/29/2025 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 8/1/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 8/7/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 8/7/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 8/11/2025 Approved DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 8/12/2025 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 8/14/2025 Approved STEPHANIE SWANSON
Deputy Wood Construction 8/26/2025 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/26/2025 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 9/10/2025 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 9/10/2025 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 9/10/2025 Partial Inspection CHRISTOPHER WILSON
Pre-Inspection 9/12/2025 Partial Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 9/15/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 9/15/2025 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/19/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 9/19/2025 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 9/22/2025 Not Ready for Inspection DANIEL VERA
Wood Frame 9/22/2025 Not Ready for Inspection DANIEL VERA
BUILDING-Rough-Frame 9/25/2025 Corrections Issued CHRISTOPHER WILSON
Insulation 9/25/2025 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 9/26/2025 Partial Approval CHRISTOPHER WILSON
Insulation 9/30/2025 Partial Approval CHRISTOPHER WILSON
Insulation 10/6/2025 Approved WILBER ROSALES
Underground Mechanical 10/7/2025 Partial Approval DANIEL VERA
Rough-Elec/Plmb/HVAC 10/8/2025 Approved CARLOS MATAMOROS
Insulation 10/9/2025 Approved STEPHANIE SWANSON
Underground Mechanical 10/9/2025 Partial Approval STEPHANIE SWANSON
Drywall Nailing 10/14/2025 Not Ready for Inspection SEAN HAUPT
Green Building Rough 10/14/2025 Not Ready for Inspection SEAN HAUPT
Drywall Nailing 10/17/2025 Approved DANIEL VERA
Green Building Rough 10/17/2025 Approved DANIEL VERA
Underground Mechanical 11/6/2025 Partial Approval SEAN HAUPT
Insulation 12/9/2025 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 12/22/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 12/22/2025 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 12/23/2025 Approved CHRISTOPHER WILSON
PLUMBING-Rough 12/23/2025 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 1/21/2026 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 4/21/2026 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 6/29/2026 Not Ready for Inspection RYAN SALAZAR
Final 6/29/2026 Partial Inspection RYAN SALAZAR
Green Building Final 6/29/2026 Not Ready for Inspection RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 6/29/2026 SGSOV Not Ready RYAN SALAZAR
Smoke Detectors 6/29/2026 Approved RYAN SALAZAR
ELECTRICAL-Final 7/8/2026 Approved DAVID SCANTLIN
PLUMBING-Final 7/8/2026 Approved DAVID SCANTLIN